Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a hoisting device for building construction, and belongs to the technical field of building construction, the hoisting device comprises a base, a support frame, a pull rope, a winding wheel, a power assembly and a placement box, and further comprises a pressing plate I, a pressing plate II, a transmission assembly III, a transmission assembly I, a transmission assembly II, an arc-shaped buffer block I, an arc-shaped buffer block II and a driving assembly; when the first arc-shaped buffer block is subjected to downward impact force, the third transmission assembly drives the first pressing plate to buffer and press the materials downwards through the first transmission assembly, and when the first arc-shaped buffer block is subjected to impact force from the left side or the right side, the third transmission assembly drives the second pressing plate to buffer and press the materials from the left side and the right side through the second transmission assembly. The problem that in the transportation process of an existing hoisting device, a suspension frame collides with an external wall, and transported materials can be damaged is solved.
本发明公开了一种建筑施工用吊装装置,属于建筑施工技术领域,包括底座、支撑架、拉绳、收卷轮、动力组件和放置箱,还包括:压紧板一、压紧板二、传动组件三、传动组件一、传动组件二、弧形缓冲块一、弧形缓冲块二、驱动组件;当弧形缓冲块一受到向下的撞击力时,所述传动组件三通过传动组件一驱动压紧板一向下缓冲压紧物料,当弧形缓冲块一受到左侧或右侧的撞击力时,所述传动组件三通过传动组件二驱动所述压紧板二从左右两侧对物料进行缓冲压紧;解决了现有吊装装置在运输过程中,悬吊框与外界墙体发生撞击,会对运输的材料造成损坏的问题。
The invention discloses a hoisting device for building construction, and belongs to the technical field of building construction, the hoisting device comprises a base, a support frame, a pull rope, a winding wheel, a power assembly and a placement box, and further comprises a pressing plate I, a pressing plate II, a transmission assembly III, a transmission assembly I, a transmission assembly II, an arc-shaped buffer block I, an arc-shaped buffer block II and a driving assembly; when the first arc-shaped buffer block is subjected to downward impact force, the third transmission assembly drives the first pressing plate to buffer and press the materials downwards through the first transmission assembly, and when the first arc-shaped buffer block is subjected to impact force from the left side or the right side, the third transmission assembly drives the second pressing plate to buffer and press the materials from the left side and the right side through the second transmission assembly. The problem that in the transportation process of an existing hoisting device, a suspension frame collides with an external wall, and transported materials can be damaged is solved.
本发明公开了一种建筑施工用吊装装置,属于建筑施工技术领域,包括底座、支撑架、拉绳、收卷轮、动力组件和放置箱,还包括:压紧板一、压紧板二、传动组件三、传动组件一、传动组件二、弧形缓冲块一、弧形缓冲块二、驱动组件;当弧形缓冲块一受到向下的撞击力时,所述传动组件三通过传动组件一驱动压紧板一向下缓冲压紧物料,当弧形缓冲块一受到左侧或右侧的撞击力时,所述传动组件三通过传动组件二驱动所述压紧板二从左右两侧对物料进行缓冲压紧;解决了现有吊装装置在运输过程中,悬吊框与外界墙体发生撞击,会对运输的材料造成损坏的问题。
Hoisting device for building construction
一种建筑施工用吊装装置
LIU BING (Autor:in)
10.05.2022
Patent
Elektronische Ressource
Chinesisch
Engineering construction building material hoisting device
Europäisches Patentamt | 2024
|Hoisting device for building engineering construction
Europäisches Patentamt | 2023
|Building construction reinforcement cage hoisting device
Europäisches Patentamt | 2021
|Anti-inclination building construction hoisting device
Europäisches Patentamt | 2024
|