Tower footing construction method for high-voltage power transmission and transformation project
The invention relates to the field of electric tower bases, and discloses a tower foundation construction method for a high-voltage power transmission and transformation project, which comprises the steps of cleaning operation, foundation excavation, steel bar manufacturing and installation, concrete construction and pouring and air drying on a construction site, and in the on-site cleaning process, all obstacles in the pile foundation range need to be cleaned up, and the construction site is not damaged. According to the tower footing construction method for the high-voltage power transmission and transformation project, before an iron tower foundation pit is excavated, according to a line center pile and a foundation pit center pile which are determined during pit division, when the foundation pit is excavated to be about the preset depth, a measuring tape or a measuring rod is used for repeatedly measuring the pit depth, and a cement sand wrapping method is adopted for stirring and mixing when concrete is stirred. The discharging coefficient and the utilization coefficient of the mixing drum are controlled when concrete raw materials are stirred and mixed, so that a sufficient space is formed in the mixing drum for mixing, and the uniformity of concrete mixing is improved.
本发明设计涉及电塔基座领域,且公开了一种用于高压输变电工程的塔基施工方法,包括对施工场区进行清理操作、基础开挖、钢筋制作安装与混凝土施工和浇筑风干的步骤,且现场清理过程中,须将桩基础范围内的一切障碍物清除干净,在开挖铁塔基坑前,应根据分坑时所定的线路中心桩和基坑中心桩,在基坑挖到预定深度左右时,用卷尺或测量杆对坑深进行反复的测量,在混凝土进行搅拌时采用水泥裹砂法进行搅拌混合,该用于高压输变电工程的塔基施工方法,通过在对混凝土原料进行搅拌混合时控制出料系数和搅拌筒的利用系数,使得搅拌筒内部有充分的空间进行拌和,提升了混凝土搅拌的均匀性。
Tower footing construction method for high-voltage power transmission and transformation project
The invention relates to the field of electric tower bases, and discloses a tower foundation construction method for a high-voltage power transmission and transformation project, which comprises the steps of cleaning operation, foundation excavation, steel bar manufacturing and installation, concrete construction and pouring and air drying on a construction site, and in the on-site cleaning process, all obstacles in the pile foundation range need to be cleaned up, and the construction site is not damaged. According to the tower footing construction method for the high-voltage power transmission and transformation project, before an iron tower foundation pit is excavated, according to a line center pile and a foundation pit center pile which are determined during pit division, when the foundation pit is excavated to be about the preset depth, a measuring tape or a measuring rod is used for repeatedly measuring the pit depth, and a cement sand wrapping method is adopted for stirring and mixing when concrete is stirred. The discharging coefficient and the utilization coefficient of the mixing drum are controlled when concrete raw materials are stirred and mixed, so that a sufficient space is formed in the mixing drum for mixing, and the uniformity of concrete mixing is improved.
本发明设计涉及电塔基座领域,且公开了一种用于高压输变电工程的塔基施工方法,包括对施工场区进行清理操作、基础开挖、钢筋制作安装与混凝土施工和浇筑风干的步骤,且现场清理过程中,须将桩基础范围内的一切障碍物清除干净,在开挖铁塔基坑前,应根据分坑时所定的线路中心桩和基坑中心桩,在基坑挖到预定深度左右时,用卷尺或测量杆对坑深进行反复的测量,在混凝土进行搅拌时采用水泥裹砂法进行搅拌混合,该用于高压输变电工程的塔基施工方法,通过在对混凝土原料进行搅拌混合时控制出料系数和搅拌筒的利用系数,使得搅拌筒内部有充分的空间进行拌和,提升了混凝土搅拌的均匀性。
Tower footing construction method for high-voltage power transmission and transformation project
一种用于高压输变电工程的塔基施工方法
WANG CHAO (Autor:in) / YANG FAN (Autor:in) / WU LINGJIE (Autor:in)
10.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Transmission-line-tower footing design
Engineering Index Backfile | 1958
|Tower footing reinforcing device and transmission tower device
Europäisches Patentamt | 2024
|Fabricated high-voltage iron tower for power transmission and transformation project
Europäisches Patentamt | 2022
|Power transmission line engineering tower footing slope protection device
Europäisches Patentamt | 2023
|Vertical grounding system in tower footing range of power transmission line tower
Europäisches Patentamt | 2021