The invention discloses a cableway foundation construction scheme. The cableway foundation construction scheme comprises the following steps of S1, positioning and paying off, wherein a total station is planned to be adopted for measurement work; the method comprises the following steps: S1.1, carrying out preliminary deployment on all instruments, equipment and personnel entering a site, carrying out handover work between measurement result data and site point locations or pile locations, and properly carrying out protection work on the point locations or pile locations, and S1.1, carrying out engineering measurement control: arranging a plurality of cross-shaped control networks by adopting theodolites. The errors of the central axis and the four axes are checked before the control network is tested and arranged, and a paying-off positioning map is checked. Through the method, the construction process of the cableway infrastructure can be optimized, so that the whole construction process of the cableway is more streamlined, workers have clear understanding of own work in the actual construction process, and a strict inspection system is provided for materials, so that the construction efficiency is improved to a certain extent, and the construction cost is reduced. And the probability of safety accidents in the construction process is reduced, and the practicability is high.
本发明公开了一种索道基础施工方案,包括如下步骤:S1、定位放线:拟采用全站仪进行测量工作。对所有进场的仪器设备及人员进行初步调配,做好测量成果资料与现场点位或桩位的交接工作,并妥善做好点位或桩位的保护工作,S1.1、工程测量控制:采用经纬仪布设成多个“十”字型控制网。控制网测设前应对中轴线、四轴线误差进行检查,校核放线定位图。通过此方法,可以对索道基础设施的施工过程进行优化,使得索道的整个施工过程更加流程化,在实际施工过程中工人对于自己的工作有清晰的认识,并且针对材料有严格的检查制度,因此在一定程度上提高了施工的效率,并且减少了施工过程中出现安全事故的概率,实用性强。
The invention discloses a cableway foundation construction scheme. The cableway foundation construction scheme comprises the following steps of S1, positioning and paying off, wherein a total station is planned to be adopted for measurement work; the method comprises the following steps: S1.1, carrying out preliminary deployment on all instruments, equipment and personnel entering a site, carrying out handover work between measurement result data and site point locations or pile locations, and properly carrying out protection work on the point locations or pile locations, and S1.1, carrying out engineering measurement control: arranging a plurality of cross-shaped control networks by adopting theodolites. The errors of the central axis and the four axes are checked before the control network is tested and arranged, and a paying-off positioning map is checked. Through the method, the construction process of the cableway infrastructure can be optimized, so that the whole construction process of the cableway is more streamlined, workers have clear understanding of own work in the actual construction process, and a strict inspection system is provided for materials, so that the construction efficiency is improved to a certain extent, and the construction cost is reduced. And the probability of safety accidents in the construction process is reduced, and the practicability is high.
本发明公开了一种索道基础施工方案,包括如下步骤:S1、定位放线:拟采用全站仪进行测量工作。对所有进场的仪器设备及人员进行初步调配,做好测量成果资料与现场点位或桩位的交接工作,并妥善做好点位或桩位的保护工作,S1.1、工程测量控制:采用经纬仪布设成多个“十”字型控制网。控制网测设前应对中轴线、四轴线误差进行检查,校核放线定位图。通过此方法,可以对索道基础设施的施工过程进行优化,使得索道的整个施工过程更加流程化,在实际施工过程中工人对于自己的工作有清晰的认识,并且针对材料有严格的检查制度,因此在一定程度上提高了施工的效率,并且减少了施工过程中出现安全事故的概率,实用性强。
Cableway foundation construction scheme
一种索道基础施工方案
10.05.2022
Patent