Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Curb backrest concrete formwork device and construction method thereof
The invention relates to a curb backrest concrete formwork device and a construction method thereof.The curb backrest concrete formwork device comprises a support erected above a construction face corresponding to a curb, and the support comprises a first blocking piece located on one side of the curb and a second blocking piece attached to the other side of the curb; the first stopping piece and the design position of the curb backrest concrete are arranged on the same side, and a distance is formed between the first stopping piece and the curb; the steel formwork is installed on the side, close to the curb, of the first stopping piece and vertically arranged on the construction face, and a pouring space for concrete pouring is formed between the steel formwork and the curb. By moving the formwork device in the length direction of the curb and sequentially and continuously pouring multiple sections of curb backrest concrete, construction operation is easy and convenient, manpower and time are saved, and construction efficiency is improved. And due to the limiting effect of the curb, the side pressure of concrete on the formwork can be resisted after the concrete is poured, movement of the first resisting piece and the second resisting piece is avoided, and the forming quality of the curb backrest concrete is ensured.
本发明涉及一种路缘石靠背混凝土模板装置及其施工方法,包括:对应路缘石架设于施工面之上的支架,支架包括位于路缘石一侧的第一抵挡件以及贴靠于路缘石另一侧的第二抵挡件,第一抵挡件与路缘石靠背混凝土的设计位置同侧设置且与路缘石间具有一间距;安装于第一抵挡件靠近路缘石的一侧的钢模板,立设于施工面之上,钢模板与路缘石之间形成供浇筑混凝土的浇筑空间。通过沿着路缘石的长度方向移动模板装置,并依次连续地浇筑多段路缘石靠背混凝土,施工操作简单方便,节约了人力和时间,提高了施工效率。由于路缘石的限位作用,在浇筑混凝土后能够抵挡混凝土对模板的侧压力,避免第一抵挡件和第二抵挡件的移动,确保路缘石靠背混凝土的成型质量。
Curb backrest concrete formwork device and construction method thereof
The invention relates to a curb backrest concrete formwork device and a construction method thereof.The curb backrest concrete formwork device comprises a support erected above a construction face corresponding to a curb, and the support comprises a first blocking piece located on one side of the curb and a second blocking piece attached to the other side of the curb; the first stopping piece and the design position of the curb backrest concrete are arranged on the same side, and a distance is formed between the first stopping piece and the curb; the steel formwork is installed on the side, close to the curb, of the first stopping piece and vertically arranged on the construction face, and a pouring space for concrete pouring is formed between the steel formwork and the curb. By moving the formwork device in the length direction of the curb and sequentially and continuously pouring multiple sections of curb backrest concrete, construction operation is easy and convenient, manpower and time are saved, and construction efficiency is improved. And due to the limiting effect of the curb, the side pressure of concrete on the formwork can be resisted after the concrete is poured, movement of the first resisting piece and the second resisting piece is avoided, and the forming quality of the curb backrest concrete is ensured.
本发明涉及一种路缘石靠背混凝土模板装置及其施工方法,包括:对应路缘石架设于施工面之上的支架,支架包括位于路缘石一侧的第一抵挡件以及贴靠于路缘石另一侧的第二抵挡件,第一抵挡件与路缘石靠背混凝土的设计位置同侧设置且与路缘石间具有一间距;安装于第一抵挡件靠近路缘石的一侧的钢模板,立设于施工面之上,钢模板与路缘石之间形成供浇筑混凝土的浇筑空间。通过沿着路缘石的长度方向移动模板装置,并依次连续地浇筑多段路缘石靠背混凝土,施工操作简单方便,节约了人力和时间,提高了施工效率。由于路缘石的限位作用,在浇筑混凝土后能够抵挡混凝土对模板的侧压力,避免第一抵挡件和第二抵挡件的移动,确保路缘石靠背混凝土的成型质量。
Curb backrest concrete formwork device and construction method thereof
路缘石靠背混凝土模板装置及其施工方法
MIAO CHONG (Autor:in) / DU XUEHANG (Autor:in) / LIU CHEN (Autor:in) / WEN XIAOXIANG (Autor:in) / DUAN APENG (Autor:in) / SHI QIMENG (Autor:in)
13.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Curb backrest concrete formwork device and construction method thereof
Europäisches Patentamt | 2023
|Curb backrest concrete construction device and construction method
Europäisches Patentamt | 2024
|Concrete pouring forming device for side curb rear backrest
Europäisches Patentamt | 2024
|