Floor tile flatness construction technology
The invention discloses a floor tile flatness construction technology, and belongs to the technical field of building construction. The method comprises the following steps: S1, typesetting on a structural concrete slab according to the sizes of floor tiles, and popping up a floor tile position line by using an ink line; s2, after cement mortar shot point construction is completed, a level gauge or a swinger is used for rechecking; s3, a layer of cement paste is constructed on the structural concrete slab, and a cement mortar bonding layer is constructed after cement paste construction is completed; and S4, after construction is completed, floor tiles are placed, the four corners of each floor tile are just located on the four cement mortar shot points, then the floor tiles are constructed through a rubber hammer, and after construction is completed, the next floor tile is constructed. The phenomena of poor flatness, hollowing and the like can be avoided, and the service life of a building is prolonged.
本发明公开了一种地砖平整度施工工艺,属于建筑施工技术领域。本发明的步骤为:S1:在结构混凝土板上先根据地砖的大小进行排版后,用墨线弹出地砖位置线;S2:水泥砂浆炮点施工完成后使用水准仪或扫平仪进行复核;S3:在结构混凝土板上施工一层水泥浆,水泥浆施工完成后施工水泥砂浆结合层;S4:施工完成后放置地砖,地砖的四个角应刚好在四个水泥砂浆炮点上,再使用橡胶锤对地砖进行施工,施工完成后再进行下一块地砖的施工。本发明可以避免出现平整度较差、空鼓等现象,增加建筑物的使用寿命。
Floor tile flatness construction technology
The invention discloses a floor tile flatness construction technology, and belongs to the technical field of building construction. The method comprises the following steps: S1, typesetting on a structural concrete slab according to the sizes of floor tiles, and popping up a floor tile position line by using an ink line; s2, after cement mortar shot point construction is completed, a level gauge or a swinger is used for rechecking; s3, a layer of cement paste is constructed on the structural concrete slab, and a cement mortar bonding layer is constructed after cement paste construction is completed; and S4, after construction is completed, floor tiles are placed, the four corners of each floor tile are just located on the four cement mortar shot points, then the floor tiles are constructed through a rubber hammer, and after construction is completed, the next floor tile is constructed. The phenomena of poor flatness, hollowing and the like can be avoided, and the service life of a building is prolonged.
本发明公开了一种地砖平整度施工工艺,属于建筑施工技术领域。本发明的步骤为:S1:在结构混凝土板上先根据地砖的大小进行排版后,用墨线弹出地砖位置线;S2:水泥砂浆炮点施工完成后使用水准仪或扫平仪进行复核;S3:在结构混凝土板上施工一层水泥浆,水泥浆施工完成后施工水泥砂浆结合层;S4:施工完成后放置地砖,地砖的四个角应刚好在四个水泥砂浆炮点上,再使用橡胶锤对地砖进行施工,施工完成后再进行下一块地砖的施工。本发明可以避免出现平整度较差、空鼓等现象,增加建筑物的使用寿命。
Floor tile flatness construction technology
一种地砖平整度施工工艺
ZHANG SHI (Autor:in) / LIU BAO (Autor:in) / DU JIGUANG (Autor:in) / WANG HAO (Autor:in)
13.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Novel tool for guaranteeing flatness and levelness in floor tile construction and use method
Europäisches Patentamt | 2024
|CONSTRUCTION METHOD OF FLOOR TILE AND FLOOR TILE STRUCTURE
Europäisches Patentamt | 2024
|Flatness measuring device for building engineering floor tile laying and implementation method
Europäisches Patentamt | 2021
|Online Contents | 1994