Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Basket arch concrete pouring equipment for viaduct
The basket arch concrete pouring equipment comprises a base, a concrete mixing plant, a fluid conveying pump and a pipeline connecting assembly, the concrete mixing plant is installed on the base, the fluid conveying pump is installed on one side of the concrete mixing plant, and the basket arch concrete pouring equipment is characterized in that a discharging port is formed in the end of the fluid conveying pump; an extending conveying material pipe is connected to the discharging opening, and the fluid conveying pump is connected with a pipeline connecting assembly arranged at the end of the extending conveying material pipe; the basket arch concrete pouring equipment for the viaduct has the beneficial effects that the problem that the deployment workload of concrete pouring equipment is large in the basket arch pouring process of an existing viaduct is solved, and the conveying distance is increased in a multi-section relay mode; and meanwhile, a cyclic concrete pouring mechanism can be driven to pour the basket arch, the size is small, the site requirement can be effectively reduced, the basket arch pouring efficiency is improved, and the early-stage workload of construction is reduced.
本发明公开了用于高架桥的提篮拱混凝土浇筑设备,包括基座、混凝土搅拌站、流体输送泵以及管路连接组件,所述混凝土搅拌站安装于基座上,所述流体输送泵安装于混凝土搅拌站一侧,其特征在于,所述流体输送泵的端部设有出料口,所述出料口上连接有延伸输送料管,所述流体输送泵与延伸输送料管端部设有管路连接组件连接;本发明的有益效果是,该用于高架桥的提篮拱混凝土浇筑设备,针对现有的高架桥在提篮拱浇筑过程中存在混凝土浇筑设备部署工作量大的问题,以多段中继的方式增加输送距离,同时配合可以引动巡回式的混凝土浇筑机构对提篮拱进行浇筑,其体积小,可以有效减少场地需求,提高提篮拱浇筑的效率,减少施工的前期工作量。
Basket arch concrete pouring equipment for viaduct
The basket arch concrete pouring equipment comprises a base, a concrete mixing plant, a fluid conveying pump and a pipeline connecting assembly, the concrete mixing plant is installed on the base, the fluid conveying pump is installed on one side of the concrete mixing plant, and the basket arch concrete pouring equipment is characterized in that a discharging port is formed in the end of the fluid conveying pump; an extending conveying material pipe is connected to the discharging opening, and the fluid conveying pump is connected with a pipeline connecting assembly arranged at the end of the extending conveying material pipe; the basket arch concrete pouring equipment for the viaduct has the beneficial effects that the problem that the deployment workload of concrete pouring equipment is large in the basket arch pouring process of an existing viaduct is solved, and the conveying distance is increased in a multi-section relay mode; and meanwhile, a cyclic concrete pouring mechanism can be driven to pour the basket arch, the size is small, the site requirement can be effectively reduced, the basket arch pouring efficiency is improved, and the early-stage workload of construction is reduced.
本发明公开了用于高架桥的提篮拱混凝土浇筑设备,包括基座、混凝土搅拌站、流体输送泵以及管路连接组件,所述混凝土搅拌站安装于基座上,所述流体输送泵安装于混凝土搅拌站一侧,其特征在于,所述流体输送泵的端部设有出料口,所述出料口上连接有延伸输送料管,所述流体输送泵与延伸输送料管端部设有管路连接组件连接;本发明的有益效果是,该用于高架桥的提篮拱混凝土浇筑设备,针对现有的高架桥在提篮拱浇筑过程中存在混凝土浇筑设备部署工作量大的问题,以多段中继的方式增加输送距离,同时配合可以引动巡回式的混凝土浇筑机构对提篮拱进行浇筑,其体积小,可以有效减少场地需求,提高提篮拱浇筑的效率,减少施工的前期工作量。
Basket arch concrete pouring equipment for viaduct
用于高架桥的提篮拱混凝土浇筑设备
WANG LIWU (Autor:in) / QIAN DONGDONG (Autor:in) / LIU DEXIN (Autor:in) / ZHAO HAICHUAN (Autor:in) / DING YUANZHEN (Autor:in)
17.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Repairing concrete arch viaduct
Engineering Index Backfile | 1940
|Repairing concrete arch viaduct
Engineering Index Backfile | 1940
|Automatic moving hanging basket device for steel arch encased concrete pouring
Europäisches Patentamt | 2021
|The Santa Ana concrete arch viaduct
Engineering Index Backfile | 1903