Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated steel structure integrated green building
The fabricated steel structure integrated green building comprises a main steel stand column, a cross beam lifting mechanism is arranged on the outer side of the main steel stand column, a cross beam mounting and fixing mechanism is arranged at the top end of the main steel stand column, and a positioning mechanism is arranged at the top end of the cross beam mounting and fixing mechanism; a cross beam stand column is arranged at the top end of one side of the main body steel stand column, the cross beam lifting mechanism comprises a lifting tooth block cavity groove, the lifting tooth block cavity groove is located in the middle of the outer side of the main body steel stand column, and the lifting tooth block cavity groove is fixedly connected with the middle of the outer side of the main body steel stand column. The cross beam mounting device has the beneficial effects that the cross beam can be conveniently mounted, tools are not needed during mounting, mounting is convenient and rapid, time and labor are saved during mounting and lifting, mounting and lifting stability is good, safety in the mounting process can be improved, the mounted cross beam can be conveniently fixed, fixing stability is good, and the cross beam mounting device is convenient to use. And the fixedly mounted cross beam can be prevented from shaking.
本发明公开了一种装配式钢结构集成绿色建筑,包括主体钢立柱,所述主体钢立柱的外侧设有横梁升降机构,所述主体钢立柱的顶端设有横梁安装固定机构,所述横梁安装固定机构的顶端设有定位机构,所述主体钢立柱一侧的顶端设有横梁立柱,其中,所述横梁升降机构包括升降齿块腔槽,所述升降齿块腔槽位于主体钢立柱外侧的中部,所述升降齿块腔槽与主体钢立柱外侧的中部固定连接。本发明的有益效果是:便于对横梁进行安装,安装时无需借助工具,安装较为便捷快速,安装升降时较为省时省力,安装升降的稳固性较好,有利于提高安装过程中的安全性,便于对安装后的横梁进行固定,固定的稳固性较好,有利于防止固定安装的横梁发生晃动。
Fabricated steel structure integrated green building
The fabricated steel structure integrated green building comprises a main steel stand column, a cross beam lifting mechanism is arranged on the outer side of the main steel stand column, a cross beam mounting and fixing mechanism is arranged at the top end of the main steel stand column, and a positioning mechanism is arranged at the top end of the cross beam mounting and fixing mechanism; a cross beam stand column is arranged at the top end of one side of the main body steel stand column, the cross beam lifting mechanism comprises a lifting tooth block cavity groove, the lifting tooth block cavity groove is located in the middle of the outer side of the main body steel stand column, and the lifting tooth block cavity groove is fixedly connected with the middle of the outer side of the main body steel stand column. The cross beam mounting device has the beneficial effects that the cross beam can be conveniently mounted, tools are not needed during mounting, mounting is convenient and rapid, time and labor are saved during mounting and lifting, mounting and lifting stability is good, safety in the mounting process can be improved, the mounted cross beam can be conveniently fixed, fixing stability is good, and the cross beam mounting device is convenient to use. And the fixedly mounted cross beam can be prevented from shaking.
本发明公开了一种装配式钢结构集成绿色建筑,包括主体钢立柱,所述主体钢立柱的外侧设有横梁升降机构,所述主体钢立柱的顶端设有横梁安装固定机构,所述横梁安装固定机构的顶端设有定位机构,所述主体钢立柱一侧的顶端设有横梁立柱,其中,所述横梁升降机构包括升降齿块腔槽,所述升降齿块腔槽位于主体钢立柱外侧的中部,所述升降齿块腔槽与主体钢立柱外侧的中部固定连接。本发明的有益效果是:便于对横梁进行安装,安装时无需借助工具,安装较为便捷快速,安装升降时较为省时省力,安装升降的稳固性较好,有利于提高安装过程中的安全性,便于对安装后的横梁进行固定,固定的稳固性较好,有利于防止固定安装的横梁发生晃动。
Fabricated steel structure integrated green building
一种装配式钢结构集成绿色建筑
TANG WEIDONG (Autor:in) / LYU LIPING (Autor:in) / XIONG ZHIQIANG (Autor:in)
24.05.2022
Patent
Elektronische Ressource
Chinesisch
Fabricated steel structure integrated green building and installing method thereof
Europäisches Patentamt | 2021
|Fabricated steel structure integrated green building and mounting process thereof
Europäisches Patentamt | 2020
|Fabricated structure decoration integrated green building system
Europäisches Patentamt | 2021
|Fabricated steel structure building integrated system
Europäisches Patentamt | 2022
|