Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cast-in-place building outer wall construction method and outer facade waterproof protection structure
The invention relates to the technical field of building construction, in particular to a cast-in-place building outer wall construction method based on a climbing frame, which sequentially divides a building main body into three construction areas, namely a main body structure construction area, a climbing frame auxiliary construction area and a hanging basket auxiliary construction area from top to bottom, wherein the main body structure construction area at the top of the building carries out building main body structure construction operation; formwork removal, acceptance check, window installation and water spraying test are carried out in the climbing frame auxiliary construction area; waterproof measures are arranged at the bottom of the climbing frame auxiliary construction area to guide water flow falling in the upper water spraying test process to be away from the outer vertical face of the building; a construction hanging basket is arranged in the hanging basket auxiliary construction area; the upper half part of the hanging basket auxiliary construction area is subjected to heat preservation construction, and the lower half part is subjected to external facade decoration construction. Construction in the three areas can be conducted at the same time, the construction efficiency is greatly improved, and the construction cost and the construction difficulty are reduced.
本发明涉及建筑施工技术领域,特别是涉及一种基于爬架的现浇建筑外墙施工方法,将建筑主体从顶部到底部依次分为主体结构施工区、爬架辅助施工区和吊篮辅助施工区三个施工区,其中建筑顶部的主体结构施工区进行建筑主体结构施工作业;爬架辅助施工区域内进行模板拆除、验收、窗户安装、淋水试验;在爬架辅助施工区的底部设置防水措施将上方淋水试验过程中下落的水流引导远离建筑的外立面;在吊篮辅助施工区设置施工吊篮;吊篮辅助施工区的上半部分进行保温施工,下半部分进行外立面装饰施工。三个区域内的施工可以同时进行,大大的提高了施工效率降低施工成本和施工难度。
Cast-in-place building outer wall construction method and outer facade waterproof protection structure
The invention relates to the technical field of building construction, in particular to a cast-in-place building outer wall construction method based on a climbing frame, which sequentially divides a building main body into three construction areas, namely a main body structure construction area, a climbing frame auxiliary construction area and a hanging basket auxiliary construction area from top to bottom, wherein the main body structure construction area at the top of the building carries out building main body structure construction operation; formwork removal, acceptance check, window installation and water spraying test are carried out in the climbing frame auxiliary construction area; waterproof measures are arranged at the bottom of the climbing frame auxiliary construction area to guide water flow falling in the upper water spraying test process to be away from the outer vertical face of the building; a construction hanging basket is arranged in the hanging basket auxiliary construction area; the upper half part of the hanging basket auxiliary construction area is subjected to heat preservation construction, and the lower half part is subjected to external facade decoration construction. Construction in the three areas can be conducted at the same time, the construction efficiency is greatly improved, and the construction cost and the construction difficulty are reduced.
本发明涉及建筑施工技术领域,特别是涉及一种基于爬架的现浇建筑外墙施工方法,将建筑主体从顶部到底部依次分为主体结构施工区、爬架辅助施工区和吊篮辅助施工区三个施工区,其中建筑顶部的主体结构施工区进行建筑主体结构施工作业;爬架辅助施工区域内进行模板拆除、验收、窗户安装、淋水试验;在爬架辅助施工区的底部设置防水措施将上方淋水试验过程中下落的水流引导远离建筑的外立面;在吊篮辅助施工区设置施工吊篮;吊篮辅助施工区的上半部分进行保温施工,下半部分进行外立面装饰施工。三个区域内的施工可以同时进行,大大的提高了施工效率降低施工成本和施工难度。
Cast-in-place building outer wall construction method and outer facade waterproof protection structure
现浇建筑外墙施工方法及外立面防水保护结构
ZHANG QIANG (Autor:in) / LUO JINGYUAN (Autor:in) / SHI JING (Autor:in) / LI LINLIN (Autor:in) / ZHOU NINGFEI (Autor:in)
27.05.2022
Patent
Elektronische Ressource
Chinesisch
Building outer wall gap waterproof structure and building outer wall gap waterproof method
Europäisches Patentamt | 2022
|Outer wall post-cast strip waterproof construction method
Europäisches Patentamt | 2021
|Waterproof construction method for building outer wall
Europäisches Patentamt | 2021
|Building outer wall waterproof structure and construction method thereof
Europäisches Patentamt | 2020
|