Building roof tile and construction method thereof
The invention belongs to the technical field of building materials, and particularly relates to a building roof tile and a construction method thereof.The building roof tile comprises a main body, a first clamping part and a second clamping part; the length of the tile is set to be larger than that of the slope on one side of the roof, so that gaps of the tile in the transverse direction are avoided, gaps within the roof area range are reduced, and the risk of water seepage of the roof is reduced; meanwhile, due to the fact that the first clamping parts and the second clamping parts are arranged on the two sides of the tiles, during installation, the first clamping parts and the second clamping parts between every two adjacent tiles are connected in a clamped mode, the tiles are easy and convenient to install, the workload of tile laying is reduced, and the efficiency is improved; meanwhile, due to the fact that the tiles are connected in the mode that the first clamping parts and the second clamping parts are connected in a clamping mode, after laying is completed, the tiles are not provided with screws penetrating through the tiles, channels for rainwater leakage are reduced, rainwater leakage is further reduced, and the anti-leakage performance of the tiles after installation is improved.
本发明属于建材技术领域,具体的说是一种建筑屋顶瓦片及其施工方法,包括主体、一号卡接部和二号卡接部;本发明中通过将瓦片的长度设置的长于屋顶一侧斜坡长度,使避免了瓦块在横向上的缝隙,减少了屋顶面积范围内的缝隙,降低了屋顶渗水的风险;同时由于在瓦片的两侧设置有一号卡接部与二号卡接部,安装时,相邻的两个瓦片之间一号卡接部与二号卡接部卡接即可,使瓦片的安装简便,减少了瓦片铺设的工作量提高了效率,同时由于瓦片与瓦片之间通过一号卡接部与二号卡接部卡接的形式进行连接,进而在铺设完成后瓦片完全没有穿过瓦片的螺钉,减少了雨水渗漏的通路,进一步的降低了雨水的渗漏,增加了瓦片安装后的防渗漏性能。
Building roof tile and construction method thereof
The invention belongs to the technical field of building materials, and particularly relates to a building roof tile and a construction method thereof.The building roof tile comprises a main body, a first clamping part and a second clamping part; the length of the tile is set to be larger than that of the slope on one side of the roof, so that gaps of the tile in the transverse direction are avoided, gaps within the roof area range are reduced, and the risk of water seepage of the roof is reduced; meanwhile, due to the fact that the first clamping parts and the second clamping parts are arranged on the two sides of the tiles, during installation, the first clamping parts and the second clamping parts between every two adjacent tiles are connected in a clamped mode, the tiles are easy and convenient to install, the workload of tile laying is reduced, and the efficiency is improved; meanwhile, due to the fact that the tiles are connected in the mode that the first clamping parts and the second clamping parts are connected in a clamping mode, after laying is completed, the tiles are not provided with screws penetrating through the tiles, channels for rainwater leakage are reduced, rainwater leakage is further reduced, and the anti-leakage performance of the tiles after installation is improved.
本发明属于建材技术领域,具体的说是一种建筑屋顶瓦片及其施工方法,包括主体、一号卡接部和二号卡接部;本发明中通过将瓦片的长度设置的长于屋顶一侧斜坡长度,使避免了瓦块在横向上的缝隙,减少了屋顶面积范围内的缝隙,降低了屋顶渗水的风险;同时由于在瓦片的两侧设置有一号卡接部与二号卡接部,安装时,相邻的两个瓦片之间一号卡接部与二号卡接部卡接即可,使瓦片的安装简便,减少了瓦片铺设的工作量提高了效率,同时由于瓦片与瓦片之间通过一号卡接部与二号卡接部卡接的形式进行连接,进而在铺设完成后瓦片完全没有穿过瓦片的螺钉,减少了雨水渗漏的通路,进一步的降低了雨水的渗漏,增加了瓦片安装后的防渗漏性能。
Building roof tile and construction method thereof
一种建筑屋顶瓦片及其施工方法
LUO CHUANHUI (Autor:in)
27.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
ROOF TILE CONSTRUCTION METHOD, ROOF STRUCTURE, AND ROOF TILE
Europäisches Patentamt | 2023
|PLATE ROOF TILE, AND ROOF TILE STRUCTURE AND ROOF TILE CONSTRUCTION METHOD USING PLATE ROOF TILE
Europäisches Patentamt | 2016
|Fabricated pseudo-classic building tile roof panel and construction technology thereof