Construction method of steel bar truss floor support plate supporting system
The invention provides a construction method of a steel bar truss floor bearing plate supporting system. The floor bearing plate supporting system comprises clamping pieces, vertical supports, adjustable inclined supports and adjustable transverse supports. The specific construction method of the floor support plate supporting system comprises the steps of machining and manufacturing, site acceptance, ground assembly, supporting system installation, floor support plate laying, steel bar binding, concrete pouring, dismantling and the like. Customized clamping pieces are installed through main body structure steel beams, the clamping pieces serve as supporting points of upper and lower floor bearing plates and are connected with supporting components of different forms, a supporting system is used on the top to serve as an upper support, and a pull rod is used on the lower portion to serve as a hanging support, so that a traditional method that a steel pipe frame serves as a floor bearing plate support is abandoned; the problems that an existing frame body is complex to erect, materials are difficult to transfer, and the construction speed is low are solved.
本发明提供一种钢筋桁架楼承板支撑体系施工方法,所述楼承板支撑体系包括:卡件、竖支撑、可调节斜支撑和可调节横支撑;所述楼承板支撑体系具体施工方法包括加工制作、进场验收、地面拼装、支撑体系安装、楼承板铺设、钢筋绑扎及混凝土浇筑、拆除等步骤。本发明利用主体结构钢梁安装定制卡件,使用卡件作为上下楼承板的支撑点,连接不同形式的支撑构件,顶部使用支撑系统作为上部支撑,下部使用拉杆作为吊挂支撑,以摒弃使用钢管架作为楼承板支撑的传统方法,解决其存在的架体搭设繁琐,材料倒运困难,施工速度慢等问题。
Construction method of steel bar truss floor support plate supporting system
The invention provides a construction method of a steel bar truss floor bearing plate supporting system. The floor bearing plate supporting system comprises clamping pieces, vertical supports, adjustable inclined supports and adjustable transverse supports. The specific construction method of the floor support plate supporting system comprises the steps of machining and manufacturing, site acceptance, ground assembly, supporting system installation, floor support plate laying, steel bar binding, concrete pouring, dismantling and the like. Customized clamping pieces are installed through main body structure steel beams, the clamping pieces serve as supporting points of upper and lower floor bearing plates and are connected with supporting components of different forms, a supporting system is used on the top to serve as an upper support, and a pull rod is used on the lower portion to serve as a hanging support, so that a traditional method that a steel pipe frame serves as a floor bearing plate support is abandoned; the problems that an existing frame body is complex to erect, materials are difficult to transfer, and the construction speed is low are solved.
本发明提供一种钢筋桁架楼承板支撑体系施工方法,所述楼承板支撑体系包括:卡件、竖支撑、可调节斜支撑和可调节横支撑;所述楼承板支撑体系具体施工方法包括加工制作、进场验收、地面拼装、支撑体系安装、楼承板铺设、钢筋绑扎及混凝土浇筑、拆除等步骤。本发明利用主体结构钢梁安装定制卡件,使用卡件作为上下楼承板的支撑点,连接不同形式的支撑构件,顶部使用支撑系统作为上部支撑,下部使用拉杆作为吊挂支撑,以摒弃使用钢管架作为楼承板支撑的传统方法,解决其存在的架体搭设繁琐,材料倒运困难,施工速度慢等问题。
Construction method of steel bar truss floor support plate supporting system
一种钢筋桁架楼承板支撑体系施工方法
CUI JIN (Autor:in) / GOU SHENGGUI (Autor:in) / ZHANG BAOYUN (Autor:in) / FU XIAODUO (Autor:in) / QUAN YOUWEI (Autor:in) / REN CHAOPING (Autor:in)
03.06.2022
Patent
Elektronische Ressource
Chinesisch
Steel bar truss floor support plate supporting device and construction method
Europäisches Patentamt | 2024
|Steel truss floor support plate inverted-hanging type supporting system and construction method
Europäisches Patentamt | 2021
|Self-supporting steel bar truss floor support plate support structure
Europäisches Patentamt | 2015
|Detachable self-supporting steel bar truss floor support plate
Europäisches Patentamt | 2021
|Supporting structure of steel bar truss floor support plate
Europäisches Patentamt | 2020
|