Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for determining crane or boom operating envelope on jack-up platform unit, jack-up platform unit
The present application provides a method for determining an actually implemented preload value by monitoring leg load characteristics during preloading. The method also includes determining an actual crane or boom operating envelope taking into account the actually implemented preload. The method also includes taking into account other data, such as environmental load or crane or cantilever motion.
本申请提供了一种用于通过在预加载期间监测支腿载荷特征来确定实际实现的预载荷值的方法。该方法还包括考虑实际实现的预加载来确定实际起重机或悬臂操作包络线。该方法还包括考虑其它数据,诸如环境载荷或起重机或悬臂运动。
Method for determining crane or boom operating envelope on jack-up platform unit, jack-up platform unit
The present application provides a method for determining an actually implemented preload value by monitoring leg load characteristics during preloading. The method also includes determining an actual crane or boom operating envelope taking into account the actually implemented preload. The method also includes taking into account other data, such as environmental load or crane or cantilever motion.
本申请提供了一种用于通过在预加载期间监测支腿载荷特征来确定实际实现的预载荷值的方法。该方法还包括考虑实际实现的预加载来确定实际起重机或悬臂操作包络线。该方法还包括考虑其它数据,诸如环境载荷或起重机或悬臂运动。
Method for determining crane or boom operating envelope on jack-up platform unit, jack-up platform unit
用于确定自升式平台单元上的起重机或悬臂操作包络线的方法、自升式平台单元
VAN DER HOEGEN KAJ (Autor:in) / VAN SCHIE FREDERIK (Autor:in)
07.06.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|