Tidal passing type intelligent overpass
The invention discloses a tidal passing type intelligent overpass, and belongs to the field of overpasses. According to the scheme, when a crossroad with a limited expansion space is constructed and the front of a motor vehicle is blocked, the motor vehicle can pass by means of a tidal lane without waiting, so that carbon emission is reduced, the traffic capacity is improved, and when traffic jam occurs, the motor vehicle can pass through the overpass. The blocked vehicles outside the slope point line can enter the reversible lane through the lane and pass through the other platform in the original direction, after the tidal road is paused, the vehicles run in a normal state, people, non-motor vehicles and motor vehicles do not intersect, the motor vehicles run on respective lanes under the normal condition, time and space can be fully utilized to borrow the lane for peak clipping when a peak value appears, and the traffic of the vehicles is avoided. Furthermore, the definition of the tidal channel in the general sense is expanded to an extreme value, so that the overpass can be more than the throughput of a traffic light plane intersection in time and area units.
本发明公开了一种潮汐通行式智慧立交桥,属于立交桥领域,本方案在拓展空间受限的十字路口构建,机动车前方受阻时可借助于潮汐车道不等待通过,既减少了碳排放,又提高了通行能力,当发生交通拥堵时,坡点线以外被堵的车辆可变道进入潮汐车道,从另一个平台按原方向通过,潮汐道路暂停后,车辆又按正常状态运行,人、非机动车与机动车不会交汇,机动车正常情况下各行其道,但凡出现峰值就充分利用时间和空间借道削峰,即发挥潮汐道的作用,进一步地说,把通常意义上对潮汐道的定义扩充致极值,让此立交桥能在时间、面积单位内多倍于红绿灯平面路口的通过量。
Tidal passing type intelligent overpass
The invention discloses a tidal passing type intelligent overpass, and belongs to the field of overpasses. According to the scheme, when a crossroad with a limited expansion space is constructed and the front of a motor vehicle is blocked, the motor vehicle can pass by means of a tidal lane without waiting, so that carbon emission is reduced, the traffic capacity is improved, and when traffic jam occurs, the motor vehicle can pass through the overpass. The blocked vehicles outside the slope point line can enter the reversible lane through the lane and pass through the other platform in the original direction, after the tidal road is paused, the vehicles run in a normal state, people, non-motor vehicles and motor vehicles do not intersect, the motor vehicles run on respective lanes under the normal condition, time and space can be fully utilized to borrow the lane for peak clipping when a peak value appears, and the traffic of the vehicles is avoided. Furthermore, the definition of the tidal channel in the general sense is expanded to an extreme value, so that the overpass can be more than the throughput of a traffic light plane intersection in time and area units.
本发明公开了一种潮汐通行式智慧立交桥,属于立交桥领域,本方案在拓展空间受限的十字路口构建,机动车前方受阻时可借助于潮汐车道不等待通过,既减少了碳排放,又提高了通行能力,当发生交通拥堵时,坡点线以外被堵的车辆可变道进入潮汐车道,从另一个平台按原方向通过,潮汐道路暂停后,车辆又按正常状态运行,人、非机动车与机动车不会交汇,机动车正常情况下各行其道,但凡出现峰值就充分利用时间和空间借道削峰,即发挥潮汐道的作用,进一步地说,把通常意义上对潮汐道的定义扩充致极值,让此立交桥能在时间、面积单位内多倍于红绿灯平面路口的通过量。
Tidal passing type intelligent overpass
一种潮汐通行式智慧立交桥
WANG SHOUYUAN (Autor:in)
28.06.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.