Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Supporting and retaining structure for slope building and slope building construction method
The invention relates to a retaining structure for a slope building and a slope building construction method.The construction method comprises the steps that S1, drilling is conducted on the edge of a construction area of a slope building main body structure, a support pile is poured, and a top beam is arranged at the top end of the support pile; earthwork is excavated in the soil retaining area, anchor rods with the output ends connected with the supporting piles are arranged, and a temporary retaining wall is arranged at the upper end of the top beam; s2, a slope building main body structure is constructed, a beam side bracket is poured on a side beam, close to the soil retaining area, of the lower end of the main body structure at the same time, and a water retaining ridge is poured on the side, close to the soil retaining area, of the lower end of the main body structure at the same time; s3, a prefabricated cover plate is poured, and a drainage ditch is poured between the main body structure and the supporting piles; s4, the temporary retaining wall is chiseled away, and the prefabricated cover plate is placed on the beam side bracket and the top beam; and S5, earth surface soil is backfilled, and the ground is leveled. Compared with the prior art, the retaining wall has the effect of a conventional retaining wall, secondary construction of the retaining wall can be avoided, and the retaining wall has the advantages of cost saving, construction period saving, small influence on the surrounding environment and the like.
本发明涉及一种用于坡地建筑的支挡结构和坡地建筑施工方法,施工方法包括:S1:在坡地建筑主体结构的施工区域边缘钻孔并浇注支护桩,在支护桩顶端设置冠梁;在挡土区域开挖土方并设置输出端连接支护桩的锚杆,在冠梁上端设置临时挡墙;S2:进行坡地建筑主体结构的施工,在主体结构下端靠近挡土区域的一侧边梁处同时浇筑梁侧牛腿,在主体结构下端靠近挡土区域的一侧同时浇筑挡水坎;S3:浇筑预制盖板,在主体结构与支护桩之间浇筑排水沟;S4:凿除临时挡墙,将预制盖板搁置于梁侧牛腿和冠梁上;S5:回填地表土,整平地面。与现有技术相比,本发明具有常规挡土墙的效果,能避免二次施工挡土墙,具有节约成本、工期、对周边环境影响小等优点。
Supporting and retaining structure for slope building and slope building construction method
The invention relates to a retaining structure for a slope building and a slope building construction method.The construction method comprises the steps that S1, drilling is conducted on the edge of a construction area of a slope building main body structure, a support pile is poured, and a top beam is arranged at the top end of the support pile; earthwork is excavated in the soil retaining area, anchor rods with the output ends connected with the supporting piles are arranged, and a temporary retaining wall is arranged at the upper end of the top beam; s2, a slope building main body structure is constructed, a beam side bracket is poured on a side beam, close to the soil retaining area, of the lower end of the main body structure at the same time, and a water retaining ridge is poured on the side, close to the soil retaining area, of the lower end of the main body structure at the same time; s3, a prefabricated cover plate is poured, and a drainage ditch is poured between the main body structure and the supporting piles; s4, the temporary retaining wall is chiseled away, and the prefabricated cover plate is placed on the beam side bracket and the top beam; and S5, earth surface soil is backfilled, and the ground is leveled. Compared with the prior art, the retaining wall has the effect of a conventional retaining wall, secondary construction of the retaining wall can be avoided, and the retaining wall has the advantages of cost saving, construction period saving, small influence on the surrounding environment and the like.
本发明涉及一种用于坡地建筑的支挡结构和坡地建筑施工方法,施工方法包括:S1:在坡地建筑主体结构的施工区域边缘钻孔并浇注支护桩,在支护桩顶端设置冠梁;在挡土区域开挖土方并设置输出端连接支护桩的锚杆,在冠梁上端设置临时挡墙;S2:进行坡地建筑主体结构的施工,在主体结构下端靠近挡土区域的一侧边梁处同时浇筑梁侧牛腿,在主体结构下端靠近挡土区域的一侧同时浇筑挡水坎;S3:浇筑预制盖板,在主体结构与支护桩之间浇筑排水沟;S4:凿除临时挡墙,将预制盖板搁置于梁侧牛腿和冠梁上;S5:回填地表土,整平地面。与现有技术相比,本发明具有常规挡土墙的效果,能避免二次施工挡土墙,具有节约成本、工期、对周边环境影响小等优点。
Supporting and retaining structure for slope building and slope building construction method
一种用于坡地建筑的支挡结构和坡地建筑施工方法
LU JIDONG (Autor:in) / HUANG HAIJIN (Autor:in) / WANG WUPING (Autor:in) / YAO XUEFEI (Autor:in) / JIANG YUN'AN (Autor:in) / WANG MEIFANG (Autor:in) / ZHANG LIMING (Autor:in) / GUO XIAOKUN (Autor:in) / WANG QISHUANG (Autor:in) / DU JIANJIANG (Autor:in)
01.07.2022
Patent
Elektronische Ressource
Chinesisch
Foundation soil slope supporting structure for building construction
Europäisches Patentamt | 2020
|Supporting structure for engineering slope building and construction method
Europäisches Patentamt | 2023
|Supporting frame at building slope junction for building construction
Europäisches Patentamt | 2020
Combined type roadbed slope supporting and retaining structure
Europäisches Patentamt | 2022
|