Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated keel leveling structure and mounting method thereof
The invention provides a fabricated keel leveling structure and a mounting method thereof, and belongs to the technical field of building decoration. The leveling structure is connected between a keel body and a wall and comprises an adjusting bolt connected with the wall, a fixing piece connected with the adjusting bolt and a locking piece used for locking the fixing piece, a mounting part is arranged on the keel body, a first connecting part connected with the mounting part is arranged on the side, away from the wall, of the adjusting bolt, and a second connecting part connected with the first connecting part is arranged on the side, away from the wall, of the adjusting bolt. The fixing piece comprises a second connecting part connected with one side of the wall body, supporting plates located on the two sides of the second connecting part, and telescopic pieces connected with the supporting plates. The adjusting bolt and the fixing part are arranged, the keel is leveled by changing the length, extending out of the wall, of the adjusting bolt, the telescopic part in the fixing part can quantify the adjusting amount, accurate leveling of the keel is achieved, and compared with a traditional leveling mode, leveling depending on experience is not needed, the leveling accuracy and the leveling efficiency are improved, and the keel can be automatically installed by hands; time and labor are saved.
本发明提供一种装配式龙骨调平结构及其安装方法,属于建筑装饰技术领域。该调平结构,连接于龙骨本体与墙体之间,包括与墙体连接的调节螺栓、与调节螺栓连接的固定件、用于锁紧固定件的锁紧件,龙骨本体上设置有安装部,调节螺栓远离所述墙体的一侧设置有与安装部连接的第一连接部,固定件包括与墙体一侧连接的第二连接部、位于第二连接部两侧的支撑板、与支撑板连接的伸缩件。本发明设置有调节螺栓和固定件,通过改变调节螺栓伸出墙体的长度来对龙骨进行调平,固定件中的伸缩件能够量化调节量,实现龙骨的精确调平,与传统的调平方式相比,无需依靠经验调平,提高了调平精确度和调平效率,可徒手自行安装,省时省力。
Fabricated keel leveling structure and mounting method thereof
The invention provides a fabricated keel leveling structure and a mounting method thereof, and belongs to the technical field of building decoration. The leveling structure is connected between a keel body and a wall and comprises an adjusting bolt connected with the wall, a fixing piece connected with the adjusting bolt and a locking piece used for locking the fixing piece, a mounting part is arranged on the keel body, a first connecting part connected with the mounting part is arranged on the side, away from the wall, of the adjusting bolt, and a second connecting part connected with the first connecting part is arranged on the side, away from the wall, of the adjusting bolt. The fixing piece comprises a second connecting part connected with one side of the wall body, supporting plates located on the two sides of the second connecting part, and telescopic pieces connected with the supporting plates. The adjusting bolt and the fixing part are arranged, the keel is leveled by changing the length, extending out of the wall, of the adjusting bolt, the telescopic part in the fixing part can quantify the adjusting amount, accurate leveling of the keel is achieved, and compared with a traditional leveling mode, leveling depending on experience is not needed, the leveling accuracy and the leveling efficiency are improved, and the keel can be automatically installed by hands; time and labor are saved.
本发明提供一种装配式龙骨调平结构及其安装方法,属于建筑装饰技术领域。该调平结构,连接于龙骨本体与墙体之间,包括与墙体连接的调节螺栓、与调节螺栓连接的固定件、用于锁紧固定件的锁紧件,龙骨本体上设置有安装部,调节螺栓远离所述墙体的一侧设置有与安装部连接的第一连接部,固定件包括与墙体一侧连接的第二连接部、位于第二连接部两侧的支撑板、与支撑板连接的伸缩件。本发明设置有调节螺栓和固定件,通过改变调节螺栓伸出墙体的长度来对龙骨进行调平,固定件中的伸缩件能够量化调节量,实现龙骨的精确调平,与传统的调平方式相比,无需依靠经验调平,提高了调平精确度和调平效率,可徒手自行安装,省时省力。
Fabricated keel leveling structure and mounting method thereof
一种装配式龙骨调平结构及其安装方法
DING XINXIN (Autor:in) / DING ZECHENG (Autor:in) / WANG WENGUANG (Autor:in) / ZHONG CHENG (Autor:in) / BAO XIAONA (Autor:in) / WANG JUNFENG (Autor:in) / QIAN PING (Autor:in) / FAN JINGLIN (Autor:in)
01.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
G01L
Messen von Kraft, mechanischer Spannung, Drehmoment, Arbeit, mechanischer Leistung, mechanischem Wirkungsgrad oder des Drucks von Fluiden
,
MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
Fabricated keel structure and mounting method thereof
Europäisches Patentamt | 2022
|Fabricated keel structure and mounting method thereof
Europäisches Patentamt | 2024
|Fabricated keel structure and mounting method thereof
Europäisches Patentamt | 2023
|Leveling keel and manufacturing method and mounting method thereof
Europäisches Patentamt | 2024
|