Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-voltage cable tower-climbing arrangement structure
The invention discloses a high-voltage cable tower-climbing arrangement structure in the technical field of tower-climbing system structures, and relates to the technical field of tower-climbing system structures. According to the high-voltage cable tower-climbing arrangement structure, active mounting flanges and standby mounting flanges are arranged in the middle of the outer wall of an iron tower rod body up and down at intervals, in addition, the standby mounting flange needs to be manufactured and used again when the wire terminal breaks down, quick repair can be achieved when the wire terminal breaks down, the cable coiling area is prevented from occupying underground space, and investment is saved; in addition, by arranging the supporting insulators in different directions, on the premise that the aluminum-clad steel core bare conductor meets the discharge gap requirement, the force transmission mechanism of the supporting arm is simpler, and the space utilization is more compact.
本发明公开了上塔系统结构技术领域的一种高压电缆上塔布置结构,本发明高压电缆上塔布置结构利用在铁塔杆体外壁中部上下间隔设置有现役安装法兰和备用安装法兰,其中现役安装法兰在本期使用,另外备用安装法兰在导线终端出现故障需要重新制作使用,当导线终端故障时能够快速抢修,并避免盘缆区占用地下空间、节约投资;此外,通过设置不同朝向的支撑绝缘子实现铝包钢芯裸导线满足放电间隙要求前提下,托臂传力机理更简单,空间利用更紧凑。
High-voltage cable tower-climbing arrangement structure
The invention discloses a high-voltage cable tower-climbing arrangement structure in the technical field of tower-climbing system structures, and relates to the technical field of tower-climbing system structures. According to the high-voltage cable tower-climbing arrangement structure, active mounting flanges and standby mounting flanges are arranged in the middle of the outer wall of an iron tower rod body up and down at intervals, in addition, the standby mounting flange needs to be manufactured and used again when the wire terminal breaks down, quick repair can be achieved when the wire terminal breaks down, the cable coiling area is prevented from occupying underground space, and investment is saved; in addition, by arranging the supporting insulators in different directions, on the premise that the aluminum-clad steel core bare conductor meets the discharge gap requirement, the force transmission mechanism of the supporting arm is simpler, and the space utilization is more compact.
本发明公开了上塔系统结构技术领域的一种高压电缆上塔布置结构,本发明高压电缆上塔布置结构利用在铁塔杆体外壁中部上下间隔设置有现役安装法兰和备用安装法兰,其中现役安装法兰在本期使用,另外备用安装法兰在导线终端出现故障需要重新制作使用,当导线终端故障时能够快速抢修,并避免盘缆区占用地下空间、节约投资;此外,通过设置不同朝向的支撑绝缘子实现铝包钢芯裸导线满足放电间隙要求前提下,托臂传力机理更简单,空间利用更紧凑。
High-voltage cable tower-climbing arrangement structure
一种高压电缆上塔布置结构
WU PEIGUI (Autor:in) / RAN YINING (Autor:in) / ZHENG XUELIANG (Autor:in) / CHEN ZHIZHONG (Autor:in) / QIU HAOCI (Autor:in) / CHEN XIAOXIANG (Autor:in) / LIN HAN (Autor:in) / YU RENXIN (Autor:in) / PENG LIQIANG (Autor:in) / FANG HUANGSHENG (Autor:in)
01.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Anti-climbing warning device for high-voltage iron tower
Europäisches Patentamt | 2020
|Self-climbing type installation system of steel cable tower
Europäisches Patentamt | 2021
|Formwork climbing device for cable-stayed bridge tower construction
Europäisches Patentamt | 2024
|Multifunctional intelligent climbing platform for combined cable bent tower
Europäisches Patentamt | 2023
|