Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cable-stayed bridge tower column concrete balanced conveying and arranging device
The invention provides a cable-stayed bridge tower column concrete balanced conveying and arranging device, and relates to the technical field of paint spraying. T-shaped sliding grooves are formed in the front side face and the rear side face in the supporting frame body, and a sliding frame slides in the supporting frame body through the T-shaped sliding grooves; a left-right moving part is arranged on the inner side of the sliding frame, and a front-back sliding part is arranged on the inner side of the left-right moving part. Through cooperation of the left-right moving part and the front-back sliding part, the lower end of the conveying hose does not need to be manually pushed and pulled when concrete is poured, and the lower end of the conveying hose reciprocates in the front-back direction and the left-right direction, so that the concrete has better uniformity when being discharged; the problems that when an existing pump pipe conveying and arranging device is used, pushing and pulling need to be assisted manually, a large amount of physical strength needs to be consumed, and when concrete is arranged, the uniformity is limited due to manual arrangement are solved.
本发明提供了一种斜拉桥塔柱混凝土均衡输送排布装置,涉及喷漆技术领域,包括:支撑架体;所述支撑架体内部前后两侧面均开设有T型滑槽,且支撑架体内部通过T型滑槽滑动有滑动框架;所述滑动框架内侧设置有左右移动部,且左右移动部内侧设置有前后滑动部。本发明通过左右移动部与前后滑动部的配合,能够使输送软管下端在浇筑混凝土时,无需人工进行推拉操作,并且通过输送软管下端进行前后及左右方向的往复移动,从而使得混凝土在排时,具有更好的均匀性,解决了目前泵管输送排布装置在使用时需人工辅助推拉,从而需耗费大量体力,且在排布混凝土时,由于人工排布,从而使得均匀性受到限制的问题。
Cable-stayed bridge tower column concrete balanced conveying and arranging device
The invention provides a cable-stayed bridge tower column concrete balanced conveying and arranging device, and relates to the technical field of paint spraying. T-shaped sliding grooves are formed in the front side face and the rear side face in the supporting frame body, and a sliding frame slides in the supporting frame body through the T-shaped sliding grooves; a left-right moving part is arranged on the inner side of the sliding frame, and a front-back sliding part is arranged on the inner side of the left-right moving part. Through cooperation of the left-right moving part and the front-back sliding part, the lower end of the conveying hose does not need to be manually pushed and pulled when concrete is poured, and the lower end of the conveying hose reciprocates in the front-back direction and the left-right direction, so that the concrete has better uniformity when being discharged; the problems that when an existing pump pipe conveying and arranging device is used, pushing and pulling need to be assisted manually, a large amount of physical strength needs to be consumed, and when concrete is arranged, the uniformity is limited due to manual arrangement are solved.
本发明提供了一种斜拉桥塔柱混凝土均衡输送排布装置,涉及喷漆技术领域,包括:支撑架体;所述支撑架体内部前后两侧面均开设有T型滑槽,且支撑架体内部通过T型滑槽滑动有滑动框架;所述滑动框架内侧设置有左右移动部,且左右移动部内侧设置有前后滑动部。本发明通过左右移动部与前后滑动部的配合,能够使输送软管下端在浇筑混凝土时,无需人工进行推拉操作,并且通过输送软管下端进行前后及左右方向的往复移动,从而使得混凝土在排时,具有更好的均匀性,解决了目前泵管输送排布装置在使用时需人工辅助推拉,从而需耗费大量体力,且在排布混凝土时,由于人工排布,从而使得均匀性受到限制的问题。
Cable-stayed bridge tower column concrete balanced conveying and arranging device
一种斜拉桥塔柱混凝土均衡输送排布装置
LUO ZHIQIU (Autor:in) / WANG HONGTIAN (Autor:in) / LIU YONGHUA (Autor:in)
22.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Cable-stayed bridge tower column concrete distributing device
Europäisches Patentamt | 2021
|Cable-stayed bridge tower column cable guide pipe mounting method
Europäisches Patentamt | 2022
|Mounting method for tower column steel bars of cable-stayed bridge cable tower
Europäisches Patentamt | 2024
|