Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Device and method for quickly blocking levee breach
The invention discloses a device and method for rapidly blocking a levee breach. The device comprises an adjusting frame, first color strip cloth, a first cement pipe and a first pull rope. The method comprises the steps that the adjusting frame is arranged on the dam on one side of a levee breach; one end of the lower-layer first color strip cloth is connected to the dam on one side of the levee breach; a first cement pipe is arranged on the dam between the upper-layer first color strip cloth and the lower-layer first color strip cloth; one end of a first pull rope is connected to the dam on one side of the levee breach, the other end of the first pull rope is connected with a first cement pipe, and the first pull rope is loosened, so that the first cement pipe slowly rolls into the river channel at the water inlet end of the dam; and sand-gravel materials are put on the lower-layer first color strip cloth falling to the bottom of the river channel, the lower-layer first color strip cloth falling to the bottom of the river channel is pressed, and the sand-gravel materials continue to be put in the direction of the levee breach till the levee breach is blocked. The dike breach can be rapidly controlled not to extend outwards and blocked.
本发明公开了一种快速封堵大堤决口的装置及方法,装置包括调节架、第一彩条布、第一水泥管和第一拉绳。方法包括将调节架设置于大堤决口一侧的堤坝上;将下层第一彩条布的一端连接于大堤决口一侧的堤坝上;将第一水泥管设置于上层第一彩条布和下层第一彩条布之间的堤坝上;将第一拉绳的一端连接于大堤决口一侧的堤坝上,另一端与第一水泥管相连接,松动第一拉绳,使得第一水泥管慢慢地滚落至堤坝进水端的河道内;在落至河道底部的下层第一彩条布上投入砂石料,压紧落至河道底部的下层第一彩条布,向大堤决口的方向继续投放砂石料,直至封堵住大堤决口。本发明可快速控制大堤决口不再向外扩展并封堵住大堤决口。
Device and method for quickly blocking levee breach
The invention discloses a device and method for rapidly blocking a levee breach. The device comprises an adjusting frame, first color strip cloth, a first cement pipe and a first pull rope. The method comprises the steps that the adjusting frame is arranged on the dam on one side of a levee breach; one end of the lower-layer first color strip cloth is connected to the dam on one side of the levee breach; a first cement pipe is arranged on the dam between the upper-layer first color strip cloth and the lower-layer first color strip cloth; one end of a first pull rope is connected to the dam on one side of the levee breach, the other end of the first pull rope is connected with a first cement pipe, and the first pull rope is loosened, so that the first cement pipe slowly rolls into the river channel at the water inlet end of the dam; and sand-gravel materials are put on the lower-layer first color strip cloth falling to the bottom of the river channel, the lower-layer first color strip cloth falling to the bottom of the river channel is pressed, and the sand-gravel materials continue to be put in the direction of the levee breach till the levee breach is blocked. The dike breach can be rapidly controlled not to extend outwards and blocked.
本发明公开了一种快速封堵大堤决口的装置及方法,装置包括调节架、第一彩条布、第一水泥管和第一拉绳。方法包括将调节架设置于大堤决口一侧的堤坝上;将下层第一彩条布的一端连接于大堤决口一侧的堤坝上;将第一水泥管设置于上层第一彩条布和下层第一彩条布之间的堤坝上;将第一拉绳的一端连接于大堤决口一侧的堤坝上,另一端与第一水泥管相连接,松动第一拉绳,使得第一水泥管慢慢地滚落至堤坝进水端的河道内;在落至河道底部的下层第一彩条布上投入砂石料,压紧落至河道底部的下层第一彩条布,向大堤决口的方向继续投放砂石料,直至封堵住大堤决口。本发明可快速控制大堤决口不再向外扩展并封堵住大堤决口。
Device and method for quickly blocking levee breach
一种快速封堵大堤决口的装置及方法
ZHU LIN (Autor:in) / ZHU CHUNFENG (Autor:in) / ZHU CHUNMING (Autor:in)
22.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau