Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Post-cast strip structure and construction method thereof
The invention discloses a post-cast strip structure and a construction method thereof, and relates to the technical field of constructional engineering.The post-cast strip structure comprises a foundation bed, a coiled material water stopping layer, a gravel water filtering layer, a plastic film water stopping layer and a post-cast strip concrete layer which are sequentially laid from bottom to top; steel plate water stop belts are arranged at the junctions of the post-cast strip concrete layer and the bottom plate concrete on the two sides, and a drainage assembly used for gathering and discharging underground seepage water is arranged in the gravel water filtering layer. The post-cast strip structure has the effects that the waterproof capacity of the post-cast strip structure is improved, and the leakage phenomenon is reduced.
本申请公开了一种后浇带结构及其施工方法,涉及建筑工程技术领域,后浇带结构包括由下而上依次铺设的基础垫层、卷材止水层、碎石滤水层、塑料薄膜止水层以及后浇带混凝土层,后浇带混凝土层和两侧的底板混凝土交汇处设置有钢板止水带,碎石滤水层中设置有用于将地下渗透水聚集并排出的疏水组件。本申请具有提高后浇带结构处防水能力,降低渗漏现象的效果。
Post-cast strip structure and construction method thereof
The invention discloses a post-cast strip structure and a construction method thereof, and relates to the technical field of constructional engineering.The post-cast strip structure comprises a foundation bed, a coiled material water stopping layer, a gravel water filtering layer, a plastic film water stopping layer and a post-cast strip concrete layer which are sequentially laid from bottom to top; steel plate water stop belts are arranged at the junctions of the post-cast strip concrete layer and the bottom plate concrete on the two sides, and a drainage assembly used for gathering and discharging underground seepage water is arranged in the gravel water filtering layer. The post-cast strip structure has the effects that the waterproof capacity of the post-cast strip structure is improved, and the leakage phenomenon is reduced.
本申请公开了一种后浇带结构及其施工方法,涉及建筑工程技术领域,后浇带结构包括由下而上依次铺设的基础垫层、卷材止水层、碎石滤水层、塑料薄膜止水层以及后浇带混凝土层,后浇带混凝土层和两侧的底板混凝土交汇处设置有钢板止水带,碎石滤水层中设置有用于将地下渗透水聚集并排出的疏水组件。本申请具有提高后浇带结构处防水能力,降低渗漏现象的效果。
Post-cast strip structure and construction method thereof
一种后浇带结构及其施工方法
WANG ZHENG (Autor:in) / GUO ZHIQIANG (Autor:in) / LYU XIUFENG (Autor:in) / FENG QINGJIN (Autor:in) / LI BAOZHONG (Autor:in) / SUN FENG'AN (Autor:in) / LIU JIE (Autor:in)
22.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Post-cast strip structure and construction method thereof
Europäisches Patentamt | 2021
|Post-cast strip structure and construction method thereof
Europäisches Patentamt | 2024
|Post-cast strip supporting structure and construction method thereof
Europäisches Patentamt | 2022
|Post-cast strip structure and construction process thereof
Europäisches Patentamt | 2020
|Post-cast strip plugging structure and construction method thereof
Europäisches Patentamt | 2020
|