Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Connecting structure for unit curtain wall and curtain wall construction method
The invention relates to the technical field of building curtain walls, in particular to a connecting structure for a unit curtain wall and a curtain wall construction method.The connecting structure comprises a platform code, a meson, an embedded part and a connecting piece, the embedded part is used for being connected with a building, and one side of the platform code is connected with the embedded part through the connecting piece; and the other side of the platform weight is connected with the meson through the connecting piece. The embedded part is connected with the connecting piece in advance, then concrete is poured, and the platform code is connected, so that the connecting stability of the connecting piece and the building can be improved, the connecting strength of the platform code and the building is improved, and safety accidents caused by concrete cracking due to the fact that the thickness of the concrete is not enough but the stress exceeds the bearing strength can be reduced; the effect of improving the fixing strength of curtain wall installation is achieved.
本申请涉及建筑幕墙的技术领域,尤其是涉及一种用于单元幕墙的连接结构及幕墙施工方法,其包括地台码、介子、埋件、连接件,所述埋件用于连接建筑,所述地台码一侧通过所述连接件与所述埋件相连接,所述地台码另一侧通过所述连接件与所述介子相连接。本申请将埋件提前与连接件相连接,再浇筑混凝土、连接地台码,可以提高连接件与建筑的连接稳定性,从而提高地台码与建筑的连接强度,这样就可以减少混凝土厚度不够但是受力超过承载强度,导致混凝土开裂造成的安全事故,具有提高幕墙安装的固定强度的效果。
Connecting structure for unit curtain wall and curtain wall construction method
The invention relates to the technical field of building curtain walls, in particular to a connecting structure for a unit curtain wall and a curtain wall construction method.The connecting structure comprises a platform code, a meson, an embedded part and a connecting piece, the embedded part is used for being connected with a building, and one side of the platform code is connected with the embedded part through the connecting piece; and the other side of the platform weight is connected with the meson through the connecting piece. The embedded part is connected with the connecting piece in advance, then concrete is poured, and the platform code is connected, so that the connecting stability of the connecting piece and the building can be improved, the connecting strength of the platform code and the building is improved, and safety accidents caused by concrete cracking due to the fact that the thickness of the concrete is not enough but the stress exceeds the bearing strength can be reduced; the effect of improving the fixing strength of curtain wall installation is achieved.
本申请涉及建筑幕墙的技术领域,尤其是涉及一种用于单元幕墙的连接结构及幕墙施工方法,其包括地台码、介子、埋件、连接件,所述埋件用于连接建筑,所述地台码一侧通过所述连接件与所述埋件相连接,所述地台码另一侧通过所述连接件与所述介子相连接。本申请将埋件提前与连接件相连接,再浇筑混凝土、连接地台码,可以提高连接件与建筑的连接稳定性,从而提高地台码与建筑的连接强度,这样就可以减少混凝土厚度不够但是受力超过承载强度,导致混凝土开裂造成的安全事故,具有提高幕墙安装的固定强度的效果。
Connecting structure for unit curtain wall and curtain wall construction method
一种用于单元幕墙的连接结构及幕墙施工方法
WANG FAZHI (Autor:in) / ZOU JIHUI (Autor:in)
22.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Connecting structure of curtain wall and curtain wall construction method
Europäisches Patentamt | 2023
|Curtain wall unit, curtain wall and curtain wall unit assembling method
Europäisches Patentamt | 2020
|Curtain wall unit, curtain wall and curtain wall unit assembling method
Europäisches Patentamt | 2024
|