Hanging basket formwork splicing process for bridge construction
The invention provides a hanging basket formwork splicing technology for bridge construction, and belongs to the technical field of bridge construction. The hanging basket formwork splicing process for bridge construction comprises the following steps: a, leveling a beam surface, b, laying a bearing beam, and c, laying a hanging basket formwork. D, penetrating a rear support from the rear end of a walking beam and penetrating a front support from the front end of the walking beam; e, dividing a hanging basket main framework into six parts; f, mounting a hanging basket hanging system and a bottom die; g, mounting a side die and a slideway beam; and the bottom die and the side die are tightly attached to the poured section concrete, and a jack is adopted to apply prestress for anchoring. And the construction period can be shortened under the working conditions with strict requirements such as large wind load, large span, large section and heavy weight.
本申请提供了一种桥梁施工用挂篮模板拼装工艺,属于桥梁施工技术领域。该桥梁施工用挂篮模板拼装工艺,拼装程序,包括如下步骤,a:找平梁面,b:铺设垫梁,c:从0#块横向中心线向1#及1’#节段1m位置处安装首节行走轨道,d:从行走梁后端穿入后支座、前端穿入前支座,e:挂篮主构架共分为六部分,f:安装挂篮吊挂系统和底模,g:安装侧模及滑道梁,h:调整挂篮姿态,侧模安装就位后提升后端吊杆,使底模和侧模紧贴已浇段砼,采用千斤顶施加预应力进行锚固。能够在在风荷载大、跨径大、节段大、重量大等要求严格的工况下节约施工周期。
Hanging basket formwork splicing process for bridge construction
The invention provides a hanging basket formwork splicing technology for bridge construction, and belongs to the technical field of bridge construction. The hanging basket formwork splicing process for bridge construction comprises the following steps: a, leveling a beam surface, b, laying a bearing beam, and c, laying a hanging basket formwork. D, penetrating a rear support from the rear end of a walking beam and penetrating a front support from the front end of the walking beam; e, dividing a hanging basket main framework into six parts; f, mounting a hanging basket hanging system and a bottom die; g, mounting a side die and a slideway beam; and the bottom die and the side die are tightly attached to the poured section concrete, and a jack is adopted to apply prestress for anchoring. And the construction period can be shortened under the working conditions with strict requirements such as large wind load, large span, large section and heavy weight.
本申请提供了一种桥梁施工用挂篮模板拼装工艺,属于桥梁施工技术领域。该桥梁施工用挂篮模板拼装工艺,拼装程序,包括如下步骤,a:找平梁面,b:铺设垫梁,c:从0#块横向中心线向1#及1’#节段1m位置处安装首节行走轨道,d:从行走梁后端穿入后支座、前端穿入前支座,e:挂篮主构架共分为六部分,f:安装挂篮吊挂系统和底模,g:安装侧模及滑道梁,h:调整挂篮姿态,侧模安装就位后提升后端吊杆,使底模和侧模紧贴已浇段砼,采用千斤顶施加预应力进行锚固。能够在在风荷载大、跨径大、节段大、重量大等要求严格的工况下节约施工周期。
Hanging basket formwork splicing process for bridge construction
一种桥梁施工用挂篮模板拼装工艺
WANG XINGRONG (Autor:in) / FENG CHUNLIN (Autor:in) / ZHAO SHUAIPENG (Autor:in) / LI WENQIANG (Autor:in) / GUO HAITAO (Autor:in) / LI FUYI (Autor:in) / LIANG FANGLI (Autor:in) / ZHANG YUAN (Autor:in) / HUANG CHANGMING (Autor:in) / ZHANG BOCONG (Autor:in)
26.07.2022
Patent
Elektronische Ressource
Chinesisch