Anti-hollowing paving method for floor tiles
The invention discloses an anti-hollowing paving method for floor tiles, which comprises an integral surface layer process flow and a block material surface layer process flow, and comprises the following steps: S1, treating a floor base layer; s2, surveying and setting out are conducted on the ground treated in the S1; s3, bottom layer construction is conducted on the ground treated in the S2; s4, waterproof and protective layer construction is conducted on the ground constructed in the S3; s5, dividing strips are placed on the ground subjected to waterproof treatment in the step S4; s6, slurry is poured into the ground where the dividing strips are placed; and S7, base layer leveling treatment is conducted on the ground treated in the step S6. According to the method, construction of the overall surface layer and the lump material surface layer which are prone to hollowing in the tile paving process is standardized, a standardized construction process is set through detailed construction data and construction steps, and the hollowing rate of the overall surface layer and the lump material surface layer in the tile paving process is reduced; therefore, the phenomena of hollowing and cracking after the tiles are paved are prevented.
本发明公开了一种地面瓷砖的防空鼓铺贴方法,其包括有整体面层工艺流程和块料面层工艺流程,步骤如下:S1:对地面基层进行处理;S2:对经过S1处理后的地面进行测量放线;S3:对经过S2处理后的地面进行底层施工;S4:对经过S3施工后的地面进行防水及保护层施工;S5:在经过S4做过防水后的地面放置分隔条;S6:对放置分隔条的地面浇筑泥浆;S7:对经过S6处理后地面进行基层找平处理。本发明的方法对瓷砖铺贴过程中容易产生空鼓现象的整体面层和块料面层的施工进行规范化,利用详细的施工数据和施工步骤设立标准化施工流程,降低了瓷砖铺贴过程中整体面层和块料面层的空鼓率,从而防止了瓷砖铺贴后出现空鼓、开裂的现象。
Anti-hollowing paving method for floor tiles
The invention discloses an anti-hollowing paving method for floor tiles, which comprises an integral surface layer process flow and a block material surface layer process flow, and comprises the following steps: S1, treating a floor base layer; s2, surveying and setting out are conducted on the ground treated in the S1; s3, bottom layer construction is conducted on the ground treated in the S2; s4, waterproof and protective layer construction is conducted on the ground constructed in the S3; s5, dividing strips are placed on the ground subjected to waterproof treatment in the step S4; s6, slurry is poured into the ground where the dividing strips are placed; and S7, base layer leveling treatment is conducted on the ground treated in the step S6. According to the method, construction of the overall surface layer and the lump material surface layer which are prone to hollowing in the tile paving process is standardized, a standardized construction process is set through detailed construction data and construction steps, and the hollowing rate of the overall surface layer and the lump material surface layer in the tile paving process is reduced; therefore, the phenomena of hollowing and cracking after the tiles are paved are prevented.
本发明公开了一种地面瓷砖的防空鼓铺贴方法,其包括有整体面层工艺流程和块料面层工艺流程,步骤如下:S1:对地面基层进行处理;S2:对经过S1处理后的地面进行测量放线;S3:对经过S2处理后的地面进行底层施工;S4:对经过S3施工后的地面进行防水及保护层施工;S5:在经过S4做过防水后的地面放置分隔条;S6:对放置分隔条的地面浇筑泥浆;S7:对经过S6处理后地面进行基层找平处理。本发明的方法对瓷砖铺贴过程中容易产生空鼓现象的整体面层和块料面层的施工进行规范化,利用详细的施工数据和施工步骤设立标准化施工流程,降低了瓷砖铺贴过程中整体面层和块料面层的空鼓率,从而防止了瓷砖铺贴后出现空鼓、开裂的现象。
Anti-hollowing paving method for floor tiles
一种地面瓷砖的防空鼓铺贴方法
YAN QIANG (Autor:in) / XU GUANGLIN (Autor:in) / ZHANG BIN (Autor:in) / SUN SHUYI (Autor:in)
26.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Paving method for preventing hollowing of floor tiles