Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sewage disposal well and sewage disposal well construction method
The invention discloses a sewage disposal well and a sewage disposal well construction method.The sewage disposal well is used for sewage disposal of a septic tank, the sewage disposal well comprises a shaft, the shaft comprises a high-density polyethylene double-wall corrugated pipe, the lower end of the high-density polyethylene double-wall corrugated pipe is used for being communicated with the septic tank, and the lower end of the high-density polyethylene double-wall corrugated pipe is used for being communicated with the septic tank; and a wellhead is arranged at the upper end of the high-density polyethylene double-wall corrugated pipe. According to the technical scheme, construction procedures of the sewage disposal well are reasonable, manpower and machinery are saved, the construction period is short, the construction progress is guaranteed, well completion quality is good, and leakage is not prone to occurring.
本发明公开一种清污井及清污井施工方法,所述清污井用于化粪池清污,所述清污井包括井筒,所述井筒包括高密度聚乙烯双壁波纹管,所述高密度聚乙烯双壁波纹管的下端用以连通所述化粪池,所述高密度聚乙烯双壁波纹管的上端设有井口。本技术方案,清污井施工工序合理、节约人工机械、工期短、施工进度有保证,成井质量好、不容易渗漏。
Sewage disposal well and sewage disposal well construction method
The invention discloses a sewage disposal well and a sewage disposal well construction method.The sewage disposal well is used for sewage disposal of a septic tank, the sewage disposal well comprises a shaft, the shaft comprises a high-density polyethylene double-wall corrugated pipe, the lower end of the high-density polyethylene double-wall corrugated pipe is used for being communicated with the septic tank, and the lower end of the high-density polyethylene double-wall corrugated pipe is used for being communicated with the septic tank; and a wellhead is arranged at the upper end of the high-density polyethylene double-wall corrugated pipe. According to the technical scheme, construction procedures of the sewage disposal well are reasonable, manpower and machinery are saved, the construction period is short, the construction progress is guaranteed, well completion quality is good, and leakage is not prone to occurring.
本发明公开一种清污井及清污井施工方法,所述清污井用于化粪池清污,所述清污井包括井筒,所述井筒包括高密度聚乙烯双壁波纹管,所述高密度聚乙烯双壁波纹管的下端用以连通所述化粪池,所述高密度聚乙烯双壁波纹管的上端设有井口。本技术方案,清污井施工工序合理、节约人工机械、工期短、施工进度有保证,成井质量好、不容易渗漏。
Sewage disposal well and sewage disposal well construction method
一种清污井及清污井施工方法
ZHANG YAGUANG (Autor:in) / HE JINXIANG (Autor:in) / AN HUILI (Autor:in) / ZHANG QINGHUA (Autor:in) / LYU MENGYUAN (Autor:in) / DAI SUHAN (Autor:in) / GUO JIAXIN (Autor:in)
05.08.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
ASCE | 2021
|Engineering Index Backfile | 1888
|ASCE | 2021
|Engineering Index Backfile | 1903
|