Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CL shear wall formwork whole-piece construction assembling method
The invention discloses a CL shear wall formwork whole-piece construction assembling method, and relates to the technical field of CL system shear wall formwork construction. According to the method, the sealant is used for sealing the gap between the CL shear wall formwork and the CL shear wall opening formwork, the concrete slurry leakage problem is avoided, and the engineering quality is improved; the templates are spliced by using raw materials such as battens and steel pipes on site, so that the construction cost is saved; and the positions of the split bolts of the combined template are relatively unchanged, so that the damage to the combined template caused by repeated trepanning is avoided, and the turnover utilization rate of the template is improved.
本发明公开了一种CL剪力墙模板整片施工组装方法,涉及CL体系剪力墙模板施工技术领域。本方法使用密封胶对CL剪力墙模板和CL剪力墙洞口模板缝隙密封处理,避免了出现混凝土漏浆问题,提高了工程质量;通过利用现场的木方、钢管等原材料对模板进行拼装,节约了施工成本;组合模板对拉螺栓位置相对不变,避免了反复开孔对组合模板造成破坏,提高了模板的周转利用率。
CL shear wall formwork whole-piece construction assembling method
The invention discloses a CL shear wall formwork whole-piece construction assembling method, and relates to the technical field of CL system shear wall formwork construction. According to the method, the sealant is used for sealing the gap between the CL shear wall formwork and the CL shear wall opening formwork, the concrete slurry leakage problem is avoided, and the engineering quality is improved; the templates are spliced by using raw materials such as battens and steel pipes on site, so that the construction cost is saved; and the positions of the split bolts of the combined template are relatively unchanged, so that the damage to the combined template caused by repeated trepanning is avoided, and the turnover utilization rate of the template is improved.
本发明公开了一种CL剪力墙模板整片施工组装方法,涉及CL体系剪力墙模板施工技术领域。本方法使用密封胶对CL剪力墙模板和CL剪力墙洞口模板缝隙密封处理,避免了出现混凝土漏浆问题,提高了工程质量;通过利用现场的木方、钢管等原材料对模板进行拼装,节约了施工成本;组合模板对拉螺栓位置相对不变,避免了反复开孔对组合模板造成破坏,提高了模板的周转利用率。
CL shear wall formwork whole-piece construction assembling method
CL剪力墙模板整片施工组装方法
ZHAI HONGYANG (Autor:in) / SUN TAO (Autor:in) / ZHAO LUHONG (Autor:in)
12.08.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Splicing type non-dismantling wall formwork structure, connecting piece and assembling method
Europäisches Patentamt | 2024
|A shear wall formwork reinforcing construction method
Europäisches Patentamt | 2016
|Staircase shear wall formwork reinforcing construction method
Europäisches Patentamt | 2022
|