Post-grouting grouting device for bored pile and grouting method
The invention relates to the technical field of grouting devices, in particular to a grouting device for post-grouting of a drilled pile and a grouting method. According to the technical scheme, the device comprises a soil layer body, a discharging pipe, a feeding pipe, a communicating pipe, a rotating shaft, a connecting pipe and a screw rod, a drilling body is formed in one side of the outer wall of the upper end of the soil layer body, a bottom plate is arranged on one side of the lower end in the drilling body, supporting rods are installed on the two sides of the outer wall of the upper end of the bottom plate, and a hanging ring body is installed at the upper end of the outer wall of one side of each supporting rod; a communicating pipe is installed in the supporting rod in an inserted mode, a discharging pipe is installed at the circle center of the outer wall of the upper end of the bottom plate, and a feeding pipe is installed on the outer wall of the end, penetrating through the supporting rod, of the communicating pipe in an inserted mode, and by arranging the bottom plate, the stirring rod and the connecting pipe, the effect of improving the concrete pouring quality is achieved, and the high density of concrete in the drilling body is guaranteed; a large number of gaps in the formed concrete column are avoided, and the overall structural strength of the concrete column is guaranteed.
本发明涉及注浆器装置技术领域,尤其涉及一种用于钻孔桩后压浆注浆器及注浆方法。其技术方案包括:土层本体、出料管、进料管、连通管、转轴、连接管和螺杆,所述土层本体上端外壁一侧开设有钻孔本体,所述钻孔本体内部下端一侧设置有底板,所述底板上端外壁两侧均安装有支撑杆,所述支撑杆一侧外壁上端安装有吊环本体,所述支撑杆内部插接安装有连通管,所述底板上端外壁圆心处安装有出料管,所述连通管贯穿支撑杆一端外壁插接安装有进料管,通过设置底板、搅拌杆和连接管,达到了提高混凝土浇灌质量的效果,保证了混凝土在钻孔本体内部的高密度,避免成型后的水泥柱内部具有大量空隙,保证了水泥柱的整体结构强度。
Post-grouting grouting device for bored pile and grouting method
The invention relates to the technical field of grouting devices, in particular to a grouting device for post-grouting of a drilled pile and a grouting method. According to the technical scheme, the device comprises a soil layer body, a discharging pipe, a feeding pipe, a communicating pipe, a rotating shaft, a connecting pipe and a screw rod, a drilling body is formed in one side of the outer wall of the upper end of the soil layer body, a bottom plate is arranged on one side of the lower end in the drilling body, supporting rods are installed on the two sides of the outer wall of the upper end of the bottom plate, and a hanging ring body is installed at the upper end of the outer wall of one side of each supporting rod; a communicating pipe is installed in the supporting rod in an inserted mode, a discharging pipe is installed at the circle center of the outer wall of the upper end of the bottom plate, and a feeding pipe is installed on the outer wall of the end, penetrating through the supporting rod, of the communicating pipe in an inserted mode, and by arranging the bottom plate, the stirring rod and the connecting pipe, the effect of improving the concrete pouring quality is achieved, and the high density of concrete in the drilling body is guaranteed; a large number of gaps in the formed concrete column are avoided, and the overall structural strength of the concrete column is guaranteed.
本发明涉及注浆器装置技术领域,尤其涉及一种用于钻孔桩后压浆注浆器及注浆方法。其技术方案包括:土层本体、出料管、进料管、连通管、转轴、连接管和螺杆,所述土层本体上端外壁一侧开设有钻孔本体,所述钻孔本体内部下端一侧设置有底板,所述底板上端外壁两侧均安装有支撑杆,所述支撑杆一侧外壁上端安装有吊环本体,所述支撑杆内部插接安装有连通管,所述底板上端外壁圆心处安装有出料管,所述连通管贯穿支撑杆一端外壁插接安装有进料管,通过设置底板、搅拌杆和连接管,达到了提高混凝土浇灌质量的效果,保证了混凝土在钻孔本体内部的高密度,避免成型后的水泥柱内部具有大量空隙,保证了水泥柱的整体结构强度。
Post-grouting grouting device for bored pile and grouting method
一种用于钻孔桩后压浆注浆器及注浆方法
FU XIANGBIAO (Autor:in) / ZHOU XICHUN (Autor:in) / WANG CHENGFU (Autor:in)
19.08.2022
Patent
Elektronische Ressource
Chinesisch
Experiment Research on Bored Pile with Post-Grouting Technology
British Library Conference Proceedings | 2014
|Bored Pile Post-Grouting Technology and Its Engineering Application
British Library Conference Proceedings | 2009
|Experiment Research on Bored Pile with Post-Grouting Technology
Trans Tech Publications | 2013
|