Secondary support changing construction method for deep foundation pit adjacent to subway
The invention provides a secondary support changing construction method for a deep foundation pit adjacent to a subway, which comprises the following steps: after construction of a fender post and a crown beam of the deep foundation pit is completed, an embedded part is reserved on the crown beam; earthwork is excavated to a foundation bottom plate, and triangular soil bodies below the inclined strut positions are reserved; binding foundation bottom plate reinforcing steel bars, and pre-burying a bottom plate support; a first inclined support is installed, the upper portion of the first inclined support is connected to the top beam embedded part, and the lower portion of the first inclined support is fixed to the bottom plate support; the triangular soil body below the first inclined support is excavated, and construction is conducted to a foundation bottom plate and an outer wall; constructing a force transmission belt and backfilling a fertilizer groove; erecting a second inclined support in the structure, and dismantling the first inclined support; and the internal second inclined support is dismantled. The construction progress of the subway adjacent to one side of the foundation pit and normal operation of the subway are effectively guaranteed through the secondary support changing technology.
本申请提供一种邻近地铁深基坑的二次换撑施工方法,包括步骤:深基坑围护桩及冠梁施工完成后,预埋件留置在冠梁上;开挖土方,开挖至基础底板,保留斜撑位下方三角土体;板扎基础底板钢筋,预埋底板支座;安装第一斜支撑,第一斜支撑的上部连接至冠梁预埋件上,下部固定在底板支座上;开挖第一斜支撑下方的三角土体,施工至基础底板及外墙;施工传力带及肥槽回填;架设结构内第二斜支撑,拆除第一斜支撑;拆除内部第二斜支撑。本申请通过二次换撑技术有效地保证了基坑一侧邻近运行地铁的施工进度及地铁的正常运行。
Secondary support changing construction method for deep foundation pit adjacent to subway
The invention provides a secondary support changing construction method for a deep foundation pit adjacent to a subway, which comprises the following steps: after construction of a fender post and a crown beam of the deep foundation pit is completed, an embedded part is reserved on the crown beam; earthwork is excavated to a foundation bottom plate, and triangular soil bodies below the inclined strut positions are reserved; binding foundation bottom plate reinforcing steel bars, and pre-burying a bottom plate support; a first inclined support is installed, the upper portion of the first inclined support is connected to the top beam embedded part, and the lower portion of the first inclined support is fixed to the bottom plate support; the triangular soil body below the first inclined support is excavated, and construction is conducted to a foundation bottom plate and an outer wall; constructing a force transmission belt and backfilling a fertilizer groove; erecting a second inclined support in the structure, and dismantling the first inclined support; and the internal second inclined support is dismantled. The construction progress of the subway adjacent to one side of the foundation pit and normal operation of the subway are effectively guaranteed through the secondary support changing technology.
本申请提供一种邻近地铁深基坑的二次换撑施工方法,包括步骤:深基坑围护桩及冠梁施工完成后,预埋件留置在冠梁上;开挖土方,开挖至基础底板,保留斜撑位下方三角土体;板扎基础底板钢筋,预埋底板支座;安装第一斜支撑,第一斜支撑的上部连接至冠梁预埋件上,下部固定在底板支座上;开挖第一斜支撑下方的三角土体,施工至基础底板及外墙;施工传力带及肥槽回填;架设结构内第二斜支撑,拆除第一斜支撑;拆除内部第二斜支撑。本申请通过二次换撑技术有效地保证了基坑一侧邻近运行地铁的施工进度及地铁的正常运行。
Secondary support changing construction method for deep foundation pit adjacent to subway
一种邻近地铁深基坑的二次换撑施工方法
WANG CHUANTAO (Autor:in) / PEI HAIQING (Autor:in) / ZHOU CAOGUO (Autor:in) / LIU YUANBO (Autor:in) / WANG ZHUANG (Autor:in) / WANG LIYUAN (Autor:in) / XU WENHAO (Autor:in)
26.08.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of deep foundation pit adjacent to subway
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Construction method of foundation pit adjacent to subway tunnel
Europäisches Patentamt | 2024
|External support construction method of subway deep foundation pit
Europäisches Patentamt | 2021
|Steel support changing construction structure for partition wall area in subway deep foundation pit
Europäisches Patentamt | 2023
|