Elevator shaft prefabricated frame and elevator shaft construction method
The invention provides an elevator shaft prefabricated frame, and relates to the technical field of elevators. The elevator shaft construction method comprises the steps of site planning, preparation in advance, base layer frame installation and construction, upper layer frame installation and construction, elevator installation and construction, proofreading and the like. The shaftway structure is designed in a split mode and is formed by splicing a plurality of sections of prefabricated structures, the manufacturing cost is reduced, the installation efficiency is improved, the reinforced concrete prefabricated frame structure shaftway adopts the sectional type prefabricated frame structure technology, use is guaranteed, and the manufacturing cost is saved; the structure is relatively light and convenient to hoist and assemble; triangular supporting beams are integrally poured on the two sides of the intersection of the shaft stand column and the cross beam; by means of the design, main stress components of the hoistway can be reinforced, meanwhile, the distance between the pre-installed guide rail supports can be adjusted, and the use effect is good.
本发明提出电梯井道预制框架,涉及电梯技术领域,包括基层框架以及上层框架等;还提出电梯井道施工方法,采用场地规划、预先准备、基层框架安装施工、上层框架安装施工、电梯安装施工、校对等步骤。本发明将井道结构分体设计,通过几节预制结构拼接而成,简化制造成本,提高安装效率,钢筋混凝土预制框架结构井道,来用分段式预制框架结构技术,既保证使用,又节省造价;该结构相对轻便,便于吊装及组装;在井道立柱与横梁交叉处两侧整体浇筑三角形支撑梁;此设计既对井道主要受力构件有加强作用,同时对预安装的导轨支架间距有调节作用,使用效果好。
Elevator shaft prefabricated frame and elevator shaft construction method
The invention provides an elevator shaft prefabricated frame, and relates to the technical field of elevators. The elevator shaft construction method comprises the steps of site planning, preparation in advance, base layer frame installation and construction, upper layer frame installation and construction, elevator installation and construction, proofreading and the like. The shaftway structure is designed in a split mode and is formed by splicing a plurality of sections of prefabricated structures, the manufacturing cost is reduced, the installation efficiency is improved, the reinforced concrete prefabricated frame structure shaftway adopts the sectional type prefabricated frame structure technology, use is guaranteed, and the manufacturing cost is saved; the structure is relatively light and convenient to hoist and assemble; triangular supporting beams are integrally poured on the two sides of the intersection of the shaft stand column and the cross beam; by means of the design, main stress components of the hoistway can be reinforced, meanwhile, the distance between the pre-installed guide rail supports can be adjusted, and the use effect is good.
本发明提出电梯井道预制框架,涉及电梯技术领域,包括基层框架以及上层框架等;还提出电梯井道施工方法,采用场地规划、预先准备、基层框架安装施工、上层框架安装施工、电梯安装施工、校对等步骤。本发明将井道结构分体设计,通过几节预制结构拼接而成,简化制造成本,提高安装效率,钢筋混凝土预制框架结构井道,来用分段式预制框架结构技术,既保证使用,又节省造价;该结构相对轻便,便于吊装及组装;在井道立柱与横梁交叉处两侧整体浇筑三角形支撑梁;此设计既对井道主要受力构件有加强作用,同时对预安装的导轨支架间距有调节作用,使用效果好。
Elevator shaft prefabricated frame and elevator shaft construction method
一种电梯井道预制框架及电梯井道施工方法
ZUO WANJUN (Autor:in) / SUN YU (Autor:in) / NIE MIN (Autor:in) / DONG JIE (Autor:in) / YANG XUN (Autor:in) / XU XINGZHU (Autor:in) / JIANG HUA (Autor:in) / ZHOU ZHILONG (Autor:in) / XU MINGMING (Autor:in)