Hanging basket mounting device for corridor construction and synchronous hanging basket mounting construction method
The invention discloses a hanging basket mounting device for corridor construction and a synchronous hanging basket mounting construction method. The hanging basket mounting device comprises a corridor main body, a cross beam I and a cross beam II, and the cross beam I is fixed to the upper portion of the corridor main body through a limiting seat; the cross beam II is positioned below the corridor main body and is fixedly connected to the cross beam I through a U-shaped anchor bolt; the problem that the hanging baskets are difficult to install due to insufficient width of the corridor is solved, meanwhile, the construction hanging baskets are installed at the two ends of the corridor correspondingly, synchronous construction can be conducted on the two sides, and compared with an existing construction mode, the construction efficiency is improved.
本发明公开了一种用于连廊施工的吊篮安装装置及吊篮同步安装施工方法,包括连廊主体、横梁Ⅰ和横梁Ⅱ,所述横梁Ⅰ通过限位座固定于所述连廊主体的上方;所述横梁Ⅱ位于所述连廊主体的下方,且通过U形锚栓固定连接于所述横梁Ⅰ;解决了因连廊宽度不足而导致的吊篮安装困难问题,同时本发明在连廊的两端分别安装施工吊篮,两侧可以进行同步施工,与现有的施工方式相比提升了施工效率。
Hanging basket mounting device for corridor construction and synchronous hanging basket mounting construction method
The invention discloses a hanging basket mounting device for corridor construction and a synchronous hanging basket mounting construction method. The hanging basket mounting device comprises a corridor main body, a cross beam I and a cross beam II, and the cross beam I is fixed to the upper portion of the corridor main body through a limiting seat; the cross beam II is positioned below the corridor main body and is fixedly connected to the cross beam I through a U-shaped anchor bolt; the problem that the hanging baskets are difficult to install due to insufficient width of the corridor is solved, meanwhile, the construction hanging baskets are installed at the two ends of the corridor correspondingly, synchronous construction can be conducted on the two sides, and compared with an existing construction mode, the construction efficiency is improved.
本发明公开了一种用于连廊施工的吊篮安装装置及吊篮同步安装施工方法,包括连廊主体、横梁Ⅰ和横梁Ⅱ,所述横梁Ⅰ通过限位座固定于所述连廊主体的上方;所述横梁Ⅱ位于所述连廊主体的下方,且通过U形锚栓固定连接于所述横梁Ⅰ;解决了因连廊宽度不足而导致的吊篮安装困难问题,同时本发明在连廊的两端分别安装施工吊篮,两侧可以进行同步施工,与现有的施工方式相比提升了施工效率。
Hanging basket mounting device for corridor construction and synchronous hanging basket mounting construction method
用于连廊施工的吊篮安装装置及吊篮同步安装施工方法
LUO YI (Autor:in) / PAN CHUANJUN (Autor:in) / LI PENGCHENG (Autor:in)
30.08.2022
Patent
Elektronische Ressource
Chinesisch
Mounting method of hanging basket for building construction
Europäisches Patentamt | 2023
|Hanging basket assembly and hanging basket construction method
Europäisches Patentamt | 2022
|