Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete pouring device for pile foundation construction
The invention discloses a concrete pouring device for pile foundation construction. The concrete pouring device comprises a hemispherical cover plate, and a support used for fixing an output pipe of a concrete pump truck is arranged on the hemispherical cover plate; a track ring is arranged on the hemispherical cover plate, a clamp is movably arranged in the track ring, and the clamp moves in the track ring with an output pipe of the concrete pump truck as the circle center; the clamp is used for fixing the concrete vibrating rod, and the concrete vibrating rod slides on the clamp. According to the concrete pouring device, the output pipe of the concrete pump truck is fixed through the support, and the situation that the output pipe swings to damage a foundation pile structure is avoided; the clamp moves in the track ring with the output pipe of the concrete pump truck as the circle center, so that the concrete vibrating bar fixed to the clamp evenly vibrates around the output pipe of the concrete pump truck, and arm limp and numb caused by long-time taking of a worker is avoided; the hemispherical cover plate is arranged on the foundation pile in a covering mode to protect the foundation pile, so that workers are prevented from falling into the foundation pile, and garbage is prevented from falling into the foundation pile.
本发明公开了一种桩基础施工用的混凝土浇筑装置,包括半球形罩板,半球形罩板上设置有用以固定混凝土泵车的输出管的支架;半球形罩板上开设有轨道环,且轨道环内活动设置有夹具,夹具以混凝土泵车的输出管为圆心位于轨道环内活动;夹具用于固定混凝土振动棒,且混凝土振动棒位于其上滑动。该发明提供的混凝土浇筑装置,通过支架对混凝土泵车的输出管进行固定,避免其摆动而损坏基桩结构;通过使夹具以混凝土泵车的输出管为圆心位于轨道环内活动,从而使其上固定的混凝土振动棒围绕混凝土泵车的输出管进行均匀振动,避免工人长时间拿取造成手臂酸麻;半球形罩板罩设于基桩上对其进行防护避免工人跌入和垃圾落入到基桩内。
Concrete pouring device for pile foundation construction
The invention discloses a concrete pouring device for pile foundation construction. The concrete pouring device comprises a hemispherical cover plate, and a support used for fixing an output pipe of a concrete pump truck is arranged on the hemispherical cover plate; a track ring is arranged on the hemispherical cover plate, a clamp is movably arranged in the track ring, and the clamp moves in the track ring with an output pipe of the concrete pump truck as the circle center; the clamp is used for fixing the concrete vibrating rod, and the concrete vibrating rod slides on the clamp. According to the concrete pouring device, the output pipe of the concrete pump truck is fixed through the support, and the situation that the output pipe swings to damage a foundation pile structure is avoided; the clamp moves in the track ring with the output pipe of the concrete pump truck as the circle center, so that the concrete vibrating bar fixed to the clamp evenly vibrates around the output pipe of the concrete pump truck, and arm limp and numb caused by long-time taking of a worker is avoided; the hemispherical cover plate is arranged on the foundation pile in a covering mode to protect the foundation pile, so that workers are prevented from falling into the foundation pile, and garbage is prevented from falling into the foundation pile.
本发明公开了一种桩基础施工用的混凝土浇筑装置,包括半球形罩板,半球形罩板上设置有用以固定混凝土泵车的输出管的支架;半球形罩板上开设有轨道环,且轨道环内活动设置有夹具,夹具以混凝土泵车的输出管为圆心位于轨道环内活动;夹具用于固定混凝土振动棒,且混凝土振动棒位于其上滑动。该发明提供的混凝土浇筑装置,通过支架对混凝土泵车的输出管进行固定,避免其摆动而损坏基桩结构;通过使夹具以混凝土泵车的输出管为圆心位于轨道环内活动,从而使其上固定的混凝土振动棒围绕混凝土泵车的输出管进行均匀振动,避免工人长时间拿取造成手臂酸麻;半球形罩板罩设于基桩上对其进行防护避免工人跌入和垃圾落入到基桩内。
Concrete pouring device for pile foundation construction
一种桩基础施工用的混凝土浇筑装置
02.09.2022
Patent
Elektronische Ressource
Chinesisch
Concrete pouring enclosure device for pile foundation construction
Europäisches Patentamt | 2021
|Concrete pouring equipment for foundation pile construction
Europäisches Patentamt | 2024
|