Mold bag concrete construction method
The mold bag concrete construction method comprises the following steps that a mold bag with the preset size is provided, and a first pouring opening and a second pouring opening are formed in the mold bag in the length direction of the mold bag in a spaced mode; the multiple mold bags are sewn and then laid on the slope surface in the preset direction, so that the first pouring opening is close to the slope bottom and located below the water surface, and the second pouring opening is close to the slope top; concrete pouring is conducted on the first pouring opening and the second pouring opening in sequence in the direction from the slope bottom to the slope top till the mold bag reaches the preset plumpness; the mold bag is tamped, so that the interior of the mold bag is evenly filled with the concrete; and the surface of the mold bag is washed till moisture and air in the mold bag are fully discharged, and then concrete pouring is conducted again till the mold bag is full. According to the method, segmented pouring is conducted through the two pouring openings, pouring is paused after pouring is conducted to the preset plumpness, and the mold bags are subjected to tamping, flushing and other operations, so that concrete can be laid in the mold bags more evenly, and the slope protection effect of the mold bags is improved.
本发明公开了一种模袋混凝土施工方法,包括以下步骤:提供预设尺寸的模袋,其中,模袋沿模袋的长度方向间隔开设有第一灌注口和第二灌注口;将多个模袋缝合后沿预设方向铺设在坡面上,以使第一灌注口靠近坡底且位于水面下,第二灌注口靠近坡顶;沿自坡底至坡顶的方向对第一灌注口和第二灌注口依次进行混凝土灌注,直至模袋达到预设饱满度;对模袋进行捣密,以使混凝土均匀的充填在模袋内部;冲洗模袋的表面,直至模袋内水分和空气充分排出后,再次进行混凝土灌注,直至模袋饱满。本发明的方法通过两个灌注口分段灌注,灌注到预设饱满度后暂停灌注,对模袋进行捣密、冲洗等操作,使得混凝土可以更均匀的铺设在模袋内,从而提高模袋的护坡效果。
Mold bag concrete construction method
The mold bag concrete construction method comprises the following steps that a mold bag with the preset size is provided, and a first pouring opening and a second pouring opening are formed in the mold bag in the length direction of the mold bag in a spaced mode; the multiple mold bags are sewn and then laid on the slope surface in the preset direction, so that the first pouring opening is close to the slope bottom and located below the water surface, and the second pouring opening is close to the slope top; concrete pouring is conducted on the first pouring opening and the second pouring opening in sequence in the direction from the slope bottom to the slope top till the mold bag reaches the preset plumpness; the mold bag is tamped, so that the interior of the mold bag is evenly filled with the concrete; and the surface of the mold bag is washed till moisture and air in the mold bag are fully discharged, and then concrete pouring is conducted again till the mold bag is full. According to the method, segmented pouring is conducted through the two pouring openings, pouring is paused after pouring is conducted to the preset plumpness, and the mold bags are subjected to tamping, flushing and other operations, so that concrete can be laid in the mold bags more evenly, and the slope protection effect of the mold bags is improved.
本发明公开了一种模袋混凝土施工方法,包括以下步骤:提供预设尺寸的模袋,其中,模袋沿模袋的长度方向间隔开设有第一灌注口和第二灌注口;将多个模袋缝合后沿预设方向铺设在坡面上,以使第一灌注口靠近坡底且位于水面下,第二灌注口靠近坡顶;沿自坡底至坡顶的方向对第一灌注口和第二灌注口依次进行混凝土灌注,直至模袋达到预设饱满度;对模袋进行捣密,以使混凝土均匀的充填在模袋内部;冲洗模袋的表面,直至模袋内水分和空气充分排出后,再次进行混凝土灌注,直至模袋饱满。本发明的方法通过两个灌注口分段灌注,灌注到预设饱满度后暂停灌注,对模袋进行捣密、冲洗等操作,使得混凝土可以更均匀的铺设在模袋内,从而提高模袋的护坡效果。
Mold bag concrete construction method
模袋混凝土施工方法
GAO CHANGHAI (Autor:in) / LIU XIAOMING (Autor:in) / ZHANG ZHIHONG (Autor:in) / JI PAN (Autor:in) / DU BOQIN (Autor:in) / ZHANG LEI (Autor:in)
06.09.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2016
|Underwater mold bag concrete horizontal construction method
Europäisches Patentamt | 2020
|Road surface concrete construction mold and construction method thereof
Europäisches Patentamt | 2021
|MOLD FRAME DEVICE FOR CONCRETE STRUCTURE AND MOLD FRAME CONSTRUCTION METHOD FOR CONCRETE STRUCTURE
Europäisches Patentamt | 2021
|