Geopolymer gas film concrete suction bucket foundation and construction method thereof
The invention relates to the technical field of wind energy engineering, new energy and ocean engineering, in particular to a geopolymer gas film concrete suction bucket foundation and a construction method thereof. By means of the construction method, when the concrete thin-wall structure is constructed, an inner supporting structure and a formwork do not need to be additionally arranged, and the problems that in the land prefabricating process of a top cover and a transition section structure of a large-diameter suction bucket foundation, the construction efficiency is low, the construction period is long, and the cost is high are solved; meanwhile, the geopolymer concrete is adopted to replace conventional Portland cement concrete, so that the problems of pollution and noise in the construction period are greatly reduced, and low carbon, green and environment-friendly building materials are achieved. The structural form of the suction bucket and the matched construction method can assist large-scale development and utilization of offshore wind power in the aspects of greenness, economy, high efficiency, safety and the like.
本发明涉及风能工程、新能源、海洋工程技术领域,特别是涉及一种地质聚合物气膜混凝土吸力桶基础及其施工方法。利用本发明提供的施工方法,在施工混凝土薄壁结构时,无需额外设置内支撑结构及模板,解决了大直径吸力桶基础的顶盖及过渡段结构在陆上预制过程中所面临的施工效率低、工期长、成本高等问题;同时,通过采用地质聚合物混凝土代替常规硅酸盐水泥混凝土,在大幅度降低施工期污染及噪声问题的同时,从建筑材料上做到了低碳、绿色和环保。此吸力桶的结构形式及配套施工方法能够从绿色、经济、高效、安全等方面助力海上风电的大规模开发利用。
Geopolymer gas film concrete suction bucket foundation and construction method thereof
The invention relates to the technical field of wind energy engineering, new energy and ocean engineering, in particular to a geopolymer gas film concrete suction bucket foundation and a construction method thereof. By means of the construction method, when the concrete thin-wall structure is constructed, an inner supporting structure and a formwork do not need to be additionally arranged, and the problems that in the land prefabricating process of a top cover and a transition section structure of a large-diameter suction bucket foundation, the construction efficiency is low, the construction period is long, and the cost is high are solved; meanwhile, the geopolymer concrete is adopted to replace conventional Portland cement concrete, so that the problems of pollution and noise in the construction period are greatly reduced, and low carbon, green and environment-friendly building materials are achieved. The structural form of the suction bucket and the matched construction method can assist large-scale development and utilization of offshore wind power in the aspects of greenness, economy, high efficiency, safety and the like.
本发明涉及风能工程、新能源、海洋工程技术领域,特别是涉及一种地质聚合物气膜混凝土吸力桶基础及其施工方法。利用本发明提供的施工方法,在施工混凝土薄壁结构时,无需额外设置内支撑结构及模板,解决了大直径吸力桶基础的顶盖及过渡段结构在陆上预制过程中所面临的施工效率低、工期长、成本高等问题;同时,通过采用地质聚合物混凝土代替常规硅酸盐水泥混凝土,在大幅度降低施工期污染及噪声问题的同时,从建筑材料上做到了低碳、绿色和环保。此吸力桶的结构形式及配套施工方法能够从绿色、经济、高效、安全等方面助力海上风电的大规模开发利用。
Geopolymer gas film concrete suction bucket foundation and construction method thereof
一种地质聚合物气膜混凝土吸力桶基础及其施工方法
LIAN CHONG (Autor:in) / GUO YAOHUA (Autor:in) / WANG HAIJUN (Autor:in)
13.09.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
SUCTION BUCKET FOUNDATION CONSTRUCTION METHOD, AND CONSTRUCTION MANAGEMENT SYSTEM
Europäisches Patentamt | 2024
|SUCTION BUCKET FOUNDATION HAVING PRECAST CONCRETE PRESSING BLOCKS
Europäisches Patentamt | 2022
|Suction bucket foundation with prefabricated concrete pressing blocks
Europäisches Patentamt | 2020
|Suction bucket foundation with auxiliary penetration function and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2016