Hydro-junction project spillway high slope treatment method and device
The invention belongs to the technical field of water conservancy project spillway high slopes, and provides a water conservancy project spillway high slope treatment method and device. The high slope treatment method comprises the following steps: s1, piling holes; s2, reinforcing; and s3, grouting. The treatment device comprises a main box and a driving part, the driving part is installed in the main box, and the driving part is in transmission connection with an external power machine; the sawtooth part is mounted on the main box, and the sawtooth part is in transmission connection with the driving part; the sawtooth part comprises a sawtooth strip and a saw groove, the sawtooth strip is installed in the saw groove, and the saw groove is fixedly installed on the outer surface of the main box; the saw tooth strip reciprocates in the saw groove; at least one side wall hole drilling part is mounted on the main box; the side wall hole drilling part is used for drilling holes in the side wall of the pile hole. The invention provides a hydro-junction project spillway high slope treatment method and a hydro-junction project spillway high slope treatment device so as to improve the structural strength and stability of a spillway high slope and improve the safety of a water conservancy building and a flood discharge building.
本发明属于水利枢纽工程溢洪道高边坡技术领域,提供了一种水利枢纽工程溢洪道高边坡处理方法及其装置。高边坡处理方法,包括如下步骤:s1打桩孔;s2加固;s3注浆。本发明的处理装置,包括:主箱,驱动部,驱动部安装在主箱中,驱动部与外部动力机传动连接;及锯齿部,锯齿部安装在主箱上,锯齿部与驱动部传动连接;锯齿部包括锯齿条和锯槽,锯齿条安装在锯槽中,锯槽固定安装在主箱外表面;锯齿条在锯槽中往复运动;钻侧壁孔部,钻侧壁孔部不少于一处的安装在主箱上;钻侧壁孔部用于向桩孔的侧壁钻孔。本发明提供一种水利枢纽工程溢洪道高边坡处理方法及其装置,以提高溢洪道高边坡的结构强度及稳定性,增加水利建筑物和泄洪建筑物安全性。
Hydro-junction project spillway high slope treatment method and device
The invention belongs to the technical field of water conservancy project spillway high slopes, and provides a water conservancy project spillway high slope treatment method and device. The high slope treatment method comprises the following steps: s1, piling holes; s2, reinforcing; and s3, grouting. The treatment device comprises a main box and a driving part, the driving part is installed in the main box, and the driving part is in transmission connection with an external power machine; the sawtooth part is mounted on the main box, and the sawtooth part is in transmission connection with the driving part; the sawtooth part comprises a sawtooth strip and a saw groove, the sawtooth strip is installed in the saw groove, and the saw groove is fixedly installed on the outer surface of the main box; the saw tooth strip reciprocates in the saw groove; at least one side wall hole drilling part is mounted on the main box; the side wall hole drilling part is used for drilling holes in the side wall of the pile hole. The invention provides a hydro-junction project spillway high slope treatment method and a hydro-junction project spillway high slope treatment device so as to improve the structural strength and stability of a spillway high slope and improve the safety of a water conservancy building and a flood discharge building.
本发明属于水利枢纽工程溢洪道高边坡技术领域,提供了一种水利枢纽工程溢洪道高边坡处理方法及其装置。高边坡处理方法,包括如下步骤:s1打桩孔;s2加固;s3注浆。本发明的处理装置,包括:主箱,驱动部,驱动部安装在主箱中,驱动部与外部动力机传动连接;及锯齿部,锯齿部安装在主箱上,锯齿部与驱动部传动连接;锯齿部包括锯齿条和锯槽,锯齿条安装在锯槽中,锯槽固定安装在主箱外表面;锯齿条在锯槽中往复运动;钻侧壁孔部,钻侧壁孔部不少于一处的安装在主箱上;钻侧壁孔部用于向桩孔的侧壁钻孔。本发明提供一种水利枢纽工程溢洪道高边坡处理方法及其装置,以提高溢洪道高边坡的结构强度及稳定性,增加水利建筑物和泄洪建筑物安全性。
Hydro-junction project spillway high slope treatment method and device
一种水利枢纽工程溢洪道高边坡处理方法及其装置
LIU QIANG (Autor:in) / KUAI ZHONGYU (Autor:in) / WU YAHUI (Autor:in) / FAN SUZHENG (Autor:in) / QIN XUE'ER (Autor:in) / YANG YAN (Autor:in)
20.09.2022
Patent
Elektronische Ressource
Chinesisch
Tunnel Spillway for a High-Head Hydro Development
British Library Online Contents | 1992
|Auxiliary Spillway of MRICA Hydro Electric Plant
British Library Conference Proceedings | 1992
|Seismic Analysis of High-Rise Intake Tower of the 2^n^d Spillway Tunnel of Zipingpu Hydro-Junction
British Library Conference Proceedings | 2010
|