Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Field pole-mounted circuit breaker test operation platform
The invention discloses a field pole-mounted circuit breaker test operation platform, which comprises a lift truck chassis, a folding telescopic bracket, a working platform and a terrain reinforcing mechanism, and is characterized in that the terrain reinforcing mechanism comprises a storage device and a fixing device. According to the on-pole complex operation working platform suitable for the electric pole on the field severe terrain, the phase-change material is injected into the storage device, and before the lifting truck finds the position for lifting work, the phase-change material in the storage device is heated and melted and then is conveyed into the fixing device at the bottom of the lifting truck chassis; the fixing device adopts the phase-change material wrapped in the elastic material, the fixing device is in contact with and covers the field uneven ground along with the increase of the size, the fixing device is tightly attached to the ground to be fixed after the phase-change material is cooled, the gravity center of the lift truck is lowered, meanwhile, the contact area with the ground is increased, and the lift truck adapts to the field uneven terrain environment; and debugging operation can be completed on equipment on an electric pole in field severe terrains.
本发明公开了一种野外柱上断路器试验作业平台,包括升降车底盘、折叠伸缩支架、工作平台和地形加固机构,地形加固机构包括储存装置和固定装置。本发明提供了一种能适用于野外恶劣地形电杆的杆上复杂作业工作平台,储存装置内注有相变材料,在升降车找好位置进行升降工作之前,将储存装置内的相变材料加热融化后传输到升降车底盘底部的固定装置内,固定装置采用弹性材料包裹其内的相变材料,固定装置随着体积的增大接触并覆盖野外凹凸不平的地面,相变材料冷却后固定装置紧贴地面固定,降低升降车重心的同时增加与地面的接触面积,使其适应野外凹凸不平的地形环境,能够对处在野外恶劣地形电杆上的设备完成调试作业。
Field pole-mounted circuit breaker test operation platform
The invention discloses a field pole-mounted circuit breaker test operation platform, which comprises a lift truck chassis, a folding telescopic bracket, a working platform and a terrain reinforcing mechanism, and is characterized in that the terrain reinforcing mechanism comprises a storage device and a fixing device. According to the on-pole complex operation working platform suitable for the electric pole on the field severe terrain, the phase-change material is injected into the storage device, and before the lifting truck finds the position for lifting work, the phase-change material in the storage device is heated and melted and then is conveyed into the fixing device at the bottom of the lifting truck chassis; the fixing device adopts the phase-change material wrapped in the elastic material, the fixing device is in contact with and covers the field uneven ground along with the increase of the size, the fixing device is tightly attached to the ground to be fixed after the phase-change material is cooled, the gravity center of the lift truck is lowered, meanwhile, the contact area with the ground is increased, and the lift truck adapts to the field uneven terrain environment; and debugging operation can be completed on equipment on an electric pole in field severe terrains.
本发明公开了一种野外柱上断路器试验作业平台,包括升降车底盘、折叠伸缩支架、工作平台和地形加固机构,地形加固机构包括储存装置和固定装置。本发明提供了一种能适用于野外恶劣地形电杆的杆上复杂作业工作平台,储存装置内注有相变材料,在升降车找好位置进行升降工作之前,将储存装置内的相变材料加热融化后传输到升降车底盘底部的固定装置内,固定装置采用弹性材料包裹其内的相变材料,固定装置随着体积的增大接触并覆盖野外凹凸不平的地面,相变材料冷却后固定装置紧贴地面固定,降低升降车重心的同时增加与地面的接触面积,使其适应野外凹凸不平的地形环境,能够对处在野外恶劣地形电杆上的设备完成调试作业。
Field pole-mounted circuit breaker test operation platform
一种野外柱上断路器试验作业平台
YU JINGFENG (Autor:in) / MO JINLONG (Autor:in) / SUN XIANSHAN (Autor:in) / CAI JINMING (Autor:in) / PAN AIMIN (Autor:in) / WU CHENG (Autor:in) / ZHANG JIE (Autor:in) / SHEN MINJIE (Autor:in) / HE XIANGLONG (Autor:in) / ZHOU FANGQI (Autor:in)
23.09.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Pole-mounted equipment maintenance auxiliary platform
Europäisches Patentamt | 2022
|