Pipe groove structure and method for deeply burying pipe groove
The invention discloses a pipe groove structure and a method for deeply burying a pipe groove. The method for deeply burying the pipe groove comprises the steps that S1, the ground where a pipeline is buried is excavated till a foundation pit with the preset depth is formed; s2, a bottom plate and two side plates are sequentially poured on the foundation pit, and a pipe groove without a cover is formed; s3, a pipeline is laid in the pipe groove; s4, the upper portion of the pipe groove is covered with a cover plate; and S5, the cover plate is filled with soil till the cover plate is flush with the ground. According to the pipe groove structure and the method for deeply burying the pipe groove, the pipeline is laid in the pipe groove, and the cover plate is additionally arranged, so that the pipeline is protected from being damaged due to extrusion and impact of external soil, the possibility of uneven settlement is also reduced, and the pipeline can be deeply buried; and force is uniformly transmitted through the cover plate, so that backfill materials can be prevented from overflowing from the pipe groove, and uniform stress of the pipeline is ensured.
本发明公开了一种管槽结构和深埋管槽方法,该深埋管槽方法包括:S1、开挖用于埋设管道的地面至形成预定深度的基坑;S2、在所述基坑的上面依次浇筑底板、两个侧板,形成无盖的管槽;S3、在所述管槽中铺设管道;S4、在所述管槽的上部盖上盖板;S5、在所述盖板上填上泥土至与地面持平。该管槽结构和深埋管槽方法,通过将管道铺设在管槽之中,并且加上盖板,保护了管道免受外部泥土的挤压、冲击而受到破坏,也减小了发生不均匀沉降的可能,使得管道可以被埋设得深;通过盖板均匀传力,可以防止回填料从管槽中溢出,确保管道受力均匀。
Pipe groove structure and method for deeply burying pipe groove
The invention discloses a pipe groove structure and a method for deeply burying a pipe groove. The method for deeply burying the pipe groove comprises the steps that S1, the ground where a pipeline is buried is excavated till a foundation pit with the preset depth is formed; s2, a bottom plate and two side plates are sequentially poured on the foundation pit, and a pipe groove without a cover is formed; s3, a pipeline is laid in the pipe groove; s4, the upper portion of the pipe groove is covered with a cover plate; and S5, the cover plate is filled with soil till the cover plate is flush with the ground. According to the pipe groove structure and the method for deeply burying the pipe groove, the pipeline is laid in the pipe groove, and the cover plate is additionally arranged, so that the pipeline is protected from being damaged due to extrusion and impact of external soil, the possibility of uneven settlement is also reduced, and the pipeline can be deeply buried; and force is uniformly transmitted through the cover plate, so that backfill materials can be prevented from overflowing from the pipe groove, and uniform stress of the pipeline is ensured.
本发明公开了一种管槽结构和深埋管槽方法,该深埋管槽方法包括:S1、开挖用于埋设管道的地面至形成预定深度的基坑;S2、在所述基坑的上面依次浇筑底板、两个侧板,形成无盖的管槽;S3、在所述管槽中铺设管道;S4、在所述管槽的上部盖上盖板;S5、在所述盖板上填上泥土至与地面持平。该管槽结构和深埋管槽方法,通过将管道铺设在管槽之中,并且加上盖板,保护了管道免受外部泥土的挤压、冲击而受到破坏,也减小了发生不均匀沉降的可能,使得管道可以被埋设得深;通过盖板均匀传力,可以防止回填料从管槽中溢出,确保管道受力均匀。
Pipe groove structure and method for deeply burying pipe groove
管槽结构和深埋管槽方法
KONG WEIYAO (Autor:in) / XU ZHEN (Autor:in) / YAO LI (Autor:in) / SHENG JUN (Autor:in) / HAN LIANG (Autor:in) / XU YI (Autor:in) / YANG HAILONG (Autor:in)
27.09.2022
Patent
Elektronische Ressource
Chinesisch