Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Artificial landscape mountain for coastal dredger fill area and construction method
The invention discloses an artificial landscape mountain for a coastal dredger fill area and a construction method. The artificial landscape mountain comprises a foundation layer, a mountain filling layer and a covering layer. The mountain filling layer is built on the foundation layer, and the covering layer covers the mountain filling layer; the foundation layer building forms a support for the mountain filling layer and the covering layer below the set elevation; the foundation layer comprises a supporting layer, a mattress layer and a leveling layer, the supporting layer is formed by arranging a plurality of supporting piles at intervals, the mattress layer is laid on the top of the supporting layer, the top of the mattress layer is covered with the leveling layer, and the top face of the leveling layer is flush with the set elevation; the mattress layer comprises a geogrid I and graded broken stone with the particle size of 15-30 mm, the geogrid I is embedded between the graded broken stone with the particle size of 15-30 mm, and the thickness of the mattress layer is not smaller than 300 mm; filling conditions, landscape mountain stability and foundation bearing capacity can be fully considered, and safety construction of the artificial landscape mountain in the coastal dredger fill area is met.
本发明公开了一种用于临海冲填土地区的人造景观山体及建造方法,包括地基层、山体填筑层和覆盖层;所述山体填筑层建筑于地基层之上,所述覆盖层覆盖于山体填筑层;所述地基层建筑于设定标高的下方形成对山体填筑层和覆盖层的支撑;所述地基层包括支撑层、褥垫层和找平层,所述支撑层由若干根支撑桩间隔布置形成,所述褥垫层铺设于支撑层的顶部,所述找平层覆盖于褥垫层的顶部,所述找平层的顶面与设定标高平齐;所述褥垫层包括土工格栅Ⅰ和粒径15mm~30mm的级配碎石,所述土工格栅Ⅰ被埋设于粒径15mm~30mm的级配碎石之间,所述褥垫层的厚度不小于300mm;能够充分考虑填土条件、景观山体稳定性以及地基承载力,满足沿海冲填土地区人造景观山体的安全性建设。
Artificial landscape mountain for coastal dredger fill area and construction method
The invention discloses an artificial landscape mountain for a coastal dredger fill area and a construction method. The artificial landscape mountain comprises a foundation layer, a mountain filling layer and a covering layer. The mountain filling layer is built on the foundation layer, and the covering layer covers the mountain filling layer; the foundation layer building forms a support for the mountain filling layer and the covering layer below the set elevation; the foundation layer comprises a supporting layer, a mattress layer and a leveling layer, the supporting layer is formed by arranging a plurality of supporting piles at intervals, the mattress layer is laid on the top of the supporting layer, the top of the mattress layer is covered with the leveling layer, and the top face of the leveling layer is flush with the set elevation; the mattress layer comprises a geogrid I and graded broken stone with the particle size of 15-30 mm, the geogrid I is embedded between the graded broken stone with the particle size of 15-30 mm, and the thickness of the mattress layer is not smaller than 300 mm; filling conditions, landscape mountain stability and foundation bearing capacity can be fully considered, and safety construction of the artificial landscape mountain in the coastal dredger fill area is met.
本发明公开了一种用于临海冲填土地区的人造景观山体及建造方法,包括地基层、山体填筑层和覆盖层;所述山体填筑层建筑于地基层之上,所述覆盖层覆盖于山体填筑层;所述地基层建筑于设定标高的下方形成对山体填筑层和覆盖层的支撑;所述地基层包括支撑层、褥垫层和找平层,所述支撑层由若干根支撑桩间隔布置形成,所述褥垫层铺设于支撑层的顶部,所述找平层覆盖于褥垫层的顶部,所述找平层的顶面与设定标高平齐;所述褥垫层包括土工格栅Ⅰ和粒径15mm~30mm的级配碎石,所述土工格栅Ⅰ被埋设于粒径15mm~30mm的级配碎石之间,所述褥垫层的厚度不小于300mm;能够充分考虑填土条件、景观山体稳定性以及地基承载力,满足沿海冲填土地区人造景观山体的安全性建设。
Artificial landscape mountain for coastal dredger fill area and construction method
用于临海冲填土地区的人造景观山体及建造方法
ZENG JUNXIANG (Autor:in) / ZENG HONGJING (Autor:in) / WANG YANG (Autor:in) / ZHANG WENZHENG (Autor:in) / YU CHAO (Autor:in)
30.09.2022
Patent
Elektronische Ressource
Chinesisch
Construction quality control method for bidirectional stirring pile in coastal dredger fill area
Europäisches Patentamt | 2023
|Dredger fill foundation treatment construction method
Europäisches Patentamt | 2021
|Dredger fill consolidation drainage structure and dredger fill rapid reinforcement method
Europäisches Patentamt | 2023
|Construction process method for reducing dredger fill loss
Europäisches Patentamt | 2020
|