Glass curtain wall mounting method
The invention relates to a glass curtain wall installation method which comprises the following installation steps that S1, a building wall is measured, and the installation position of a vertical keel on the building wall is determined; s2, related materials are transported to the position near the building wall, and a vertical keel is fixedly arranged on the outer wall of the building wall; s3, mounting the mounting assembly on the vertical keel, and fixing the mounting assembly on the vertical keel; s4, the glass curtain wall bodies are arranged on the four adjacent mounting assemblies in the horizontal direction, and the glass curtain wall bodies are sequentially fixed from bottom to top; s5, a gap between every two adjacent glass curtain wall bodies is filled with glass cement; s6, the glass curtain wall body installed on the building wall is checked and accepted; the glass curtain wall body can be installed and fixed, and the fixing effect is excellent; shielding of the glass curtain wall body can be reduced, and the attractiveness of the glass curtain wall body is enhanced; and moreover, the single glass curtain wall body can be conveniently replaced, and the operation is simple and convenient.
本申请涉及一种玻璃幕墙安装方法,包括以下安装步骤,S1、对建筑墙体进行测量,确定竖向龙骨在建筑墙体上的安装位置;S2、将相关的物料运输到建筑墙体附近,将竖向龙骨固设于建筑墙体的外墙上;S3、将安装组件安装在竖向龙骨上,并将其固定在竖向龙骨上;S4、将玻璃幕墙本体置于水平方向相邻的四个安装组件上,从下往上依次对其进行固定;S5、对相邻的两个玻璃幕墙本体之间的缝隙处填充玻璃胶;S6、对建筑墙体上安装完成的玻璃幕墙本体进行验收;本发明能够对玻璃幕墙本体进行安装固定,固定效果较为优异;能够减少对玻璃幕墙本体的遮挡,增强其美观性;并且,还能够便于对单块的玻璃幕墙本体进行更换,操作简单便捷。
Glass curtain wall mounting method
The invention relates to a glass curtain wall installation method which comprises the following installation steps that S1, a building wall is measured, and the installation position of a vertical keel on the building wall is determined; s2, related materials are transported to the position near the building wall, and a vertical keel is fixedly arranged on the outer wall of the building wall; s3, mounting the mounting assembly on the vertical keel, and fixing the mounting assembly on the vertical keel; s4, the glass curtain wall bodies are arranged on the four adjacent mounting assemblies in the horizontal direction, and the glass curtain wall bodies are sequentially fixed from bottom to top; s5, a gap between every two adjacent glass curtain wall bodies is filled with glass cement; s6, the glass curtain wall body installed on the building wall is checked and accepted; the glass curtain wall body can be installed and fixed, and the fixing effect is excellent; shielding of the glass curtain wall body can be reduced, and the attractiveness of the glass curtain wall body is enhanced; and moreover, the single glass curtain wall body can be conveniently replaced, and the operation is simple and convenient.
本申请涉及一种玻璃幕墙安装方法,包括以下安装步骤,S1、对建筑墙体进行测量,确定竖向龙骨在建筑墙体上的安装位置;S2、将相关的物料运输到建筑墙体附近,将竖向龙骨固设于建筑墙体的外墙上;S3、将安装组件安装在竖向龙骨上,并将其固定在竖向龙骨上;S4、将玻璃幕墙本体置于水平方向相邻的四个安装组件上,从下往上依次对其进行固定;S5、对相邻的两个玻璃幕墙本体之间的缝隙处填充玻璃胶;S6、对建筑墙体上安装完成的玻璃幕墙本体进行验收;本发明能够对玻璃幕墙本体进行安装固定,固定效果较为优异;能够减少对玻璃幕墙本体的遮挡,增强其美观性;并且,还能够便于对单块的玻璃幕墙本体进行更换,操作简单便捷。
Glass curtain wall mounting method
一种玻璃幕墙安装方法
LIU YONGDONG (Autor:in) / LIU YONGLIANG (Autor:in) / ZHANG CHUANYI (Autor:in)
30.09.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Glass curtain wall mounting equipment and glass curtain mounting method