Building external wall thermal insulation system construction method and aerogel thermal insulation material used therein
The invention discloses a construction method of a building external wall thermal insulation system and an aerogel thermal insulation material used in the construction method, and relates to the technical field of building external wall thermal insulation systems. The aerogel thermal insulation material is used, the chelating infiltration rooting technology is adopted, anchoring parts are omitted, meanwhile, it is ensured that the thermal insulation layer does not fall off, the thermal insulation system reaches the A1 fireproof grade, meanwhile, the thermal conductivity coefficient equal to that of a B-grade thermal insulation board is achieved, and the volume weight is between that of the A-grade thermal insulation board and that of the B-grade thermal insulation board; according to the structure construction layer, base layer wall plastering and heat preservation plate pasting are reduced, and corresponding construction time and material equal strength time are shortened; the construction time of a traditional thermal insulation system is 61 days, and the construction time of the thermal insulation system provided by the invention is shortened to 30 days; the bottom layer plastering and pasting process is omitted, the material and labor cost is reduced, and the overall cost is slightly lower than the traditional cost.
本发明公开了一种建筑外墙保温系统施工方法及其中所用的气凝胶保温材料,涉及建筑外墙保温系统技术领域。本发明使用气凝胶保温材料采用鳌合渗入扎根技术,省去锚固件,同时确保保温层不脱落,使保温系统达到A1防火等级,同时拥有与B级保温板等同的导热系数,容重介于A级与B级保温板之间;结构构造层减少基层墙体抹灰和粘贴保温板,减少了相应的施工时间和材料等强时间;传统保温体系施工时间为61天,采用本发明提供的保温体系施工时间缩短到30天;减少了底层抹灰及粘贴过程,材料和人工费减少,整体成本略低于传统成本。
Building external wall thermal insulation system construction method and aerogel thermal insulation material used therein
The invention discloses a construction method of a building external wall thermal insulation system and an aerogel thermal insulation material used in the construction method, and relates to the technical field of building external wall thermal insulation systems. The aerogel thermal insulation material is used, the chelating infiltration rooting technology is adopted, anchoring parts are omitted, meanwhile, it is ensured that the thermal insulation layer does not fall off, the thermal insulation system reaches the A1 fireproof grade, meanwhile, the thermal conductivity coefficient equal to that of a B-grade thermal insulation board is achieved, and the volume weight is between that of the A-grade thermal insulation board and that of the B-grade thermal insulation board; according to the structure construction layer, base layer wall plastering and heat preservation plate pasting are reduced, and corresponding construction time and material equal strength time are shortened; the construction time of a traditional thermal insulation system is 61 days, and the construction time of the thermal insulation system provided by the invention is shortened to 30 days; the bottom layer plastering and pasting process is omitted, the material and labor cost is reduced, and the overall cost is slightly lower than the traditional cost.
本发明公开了一种建筑外墙保温系统施工方法及其中所用的气凝胶保温材料,涉及建筑外墙保温系统技术领域。本发明使用气凝胶保温材料采用鳌合渗入扎根技术,省去锚固件,同时确保保温层不脱落,使保温系统达到A1防火等级,同时拥有与B级保温板等同的导热系数,容重介于A级与B级保温板之间;结构构造层减少基层墙体抹灰和粘贴保温板,减少了相应的施工时间和材料等强时间;传统保温体系施工时间为61天,采用本发明提供的保温体系施工时间缩短到30天;减少了底层抹灰及粘贴过程,材料和人工费减少,整体成本略低于传统成本。
Building external wall thermal insulation system construction method and aerogel thermal insulation material used therein
建筑外墙保温系统施工方法及其中所用的气凝胶保温材料
LI SHAOHUA (Autor:in) / YUAN YAJUN (Autor:in) / WANG WEI (Autor:in) / ZENG SHUAI (Autor:in) / WU TAO (Autor:in)
11.10.2022
Patent
Elektronische Ressource
Chinesisch
Aerogel felt external wall thermal insulation system and construction method thereof
Europäisches Patentamt | 2023
|External wall thermal insulation building block and external wall thermal insulation system
Europäisches Patentamt | 2023
|