Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rubber core wall grating gabion dam and rapid damming method thereof
The invention discloses a rubber core wall grating gabion dam and a rapid damming method thereof.The rubber core wall grating gabion dam is composed of a rubber core wall, a closed-cell foam board protection layer, a concrete gabion transition area, a grating gabion, a concrete base and a dam foundation anti-seepage body, and the rubber core wall is used for replacing a traditional clay or asphalt core wall to serve as an anti-seepage material of the dam body; grating gabions are used for replacing traditional rolled soil and stone to serve as a main body area of the dam, a concrete gabion transition area is arranged between a rubber core wall and the grating gabions, the effect of supporting the rubber core wall is achieved while the grating gabions near the core wall are effectively bonded, and a closed-cell foam board protection layer is arranged between the rubber core wall and the concrete gabion transition area. The adaptability to stress and deformation of the rubber core wall is improved. The characteristic that the rubber core wall grating gabion dam can be rapidly constructed is fully utilized, the construction process of paving and rolling of a dam body filling machine is omitted, the construction progress is accelerated, and the dam body filling construction cost is saved.
本发明公开了一种橡胶心墙格栅石笼坝及其快速筑坝方法,由橡胶心墙、闭孔泡沫板保护层、混凝土石笼过渡区、格栅石笼、混凝土基座、坝基防渗体组成,利用橡胶心墙代替传统黏土或沥青心墙作为坝体的防渗材料,利用格栅石笼代替传统的碾压土石作为坝的主体区域,在橡胶心墙及格栅石笼之间设置混凝土石笼过渡区,在有效粘结心墙附近格栅石笼的同时起到支撑橡胶心墙的作用,在橡胶心墙与混凝土石笼过渡区之间设置闭孔泡沫板保护层,提高橡胶心墙适应应力和变形能力。充分利用了橡胶心墙格栅石笼坝可以快速施工的特点,省去了坝体填筑机械摊铺和碾压的施工过程,加快施工进度,节约坝体填筑施工成本。
Rubber core wall grating gabion dam and rapid damming method thereof
The invention discloses a rubber core wall grating gabion dam and a rapid damming method thereof.The rubber core wall grating gabion dam is composed of a rubber core wall, a closed-cell foam board protection layer, a concrete gabion transition area, a grating gabion, a concrete base and a dam foundation anti-seepage body, and the rubber core wall is used for replacing a traditional clay or asphalt core wall to serve as an anti-seepage material of the dam body; grating gabions are used for replacing traditional rolled soil and stone to serve as a main body area of the dam, a concrete gabion transition area is arranged between a rubber core wall and the grating gabions, the effect of supporting the rubber core wall is achieved while the grating gabions near the core wall are effectively bonded, and a closed-cell foam board protection layer is arranged between the rubber core wall and the concrete gabion transition area. The adaptability to stress and deformation of the rubber core wall is improved. The characteristic that the rubber core wall grating gabion dam can be rapidly constructed is fully utilized, the construction process of paving and rolling of a dam body filling machine is omitted, the construction progress is accelerated, and the dam body filling construction cost is saved.
本发明公开了一种橡胶心墙格栅石笼坝及其快速筑坝方法,由橡胶心墙、闭孔泡沫板保护层、混凝土石笼过渡区、格栅石笼、混凝土基座、坝基防渗体组成,利用橡胶心墙代替传统黏土或沥青心墙作为坝体的防渗材料,利用格栅石笼代替传统的碾压土石作为坝的主体区域,在橡胶心墙及格栅石笼之间设置混凝土石笼过渡区,在有效粘结心墙附近格栅石笼的同时起到支撑橡胶心墙的作用,在橡胶心墙与混凝土石笼过渡区之间设置闭孔泡沫板保护层,提高橡胶心墙适应应力和变形能力。充分利用了橡胶心墙格栅石笼坝可以快速施工的特点,省去了坝体填筑机械摊铺和碾压的施工过程,加快施工进度,节约坝体填筑施工成本。
Rubber core wall grating gabion dam and rapid damming method thereof
一种橡胶心墙格栅石笼坝及其快速筑坝方法
LIU YUXI (Autor:in) / ZHANG ZHONGHUI (Autor:in) / ZHANG BAORUI (Autor:in) / ZHOU HONGMIN (Autor:in) / YAO DESHENG (Autor:in) / ZHAO CHUNTAO (Autor:in) / LI ANG (Autor:in) / SUN SHUNAN (Autor:in) / LI MIN (Autor:in) / BAO DIXIAO (Autor:in)
11.10.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2018
|GABION, NOISE-PROTECTIVE WALL CONTAINING GABION, AND METHOD FOR CREATION OF GABION
Europäisches Patentamt | 2020
|