Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building curtain wall construction method
The invention relates to the technical field of building construction, in particular to a building curtain wall construction method which comprises the following steps: S1, surveying and setting out; s2, performing deviation treatment on the rear embedded part; s3, mounting a stand column; s4, lightning-protection grounding installation is carried out; s5, cross beam installation; s6, mounting the glass plate, namely cleaning an aluminum frame and a glass panel in the glass plate, pasting protective paper on a front side glass surface, lifting the glass plate to a mounting position, mounting the lower part of the aluminum frame in place, temporarily fixing the aluminum frame by using bolts, and tightening and fixing the aluminum frame by using bolts after the upper part of the aluminum frame is inserted in place and approved and adjusted. The mounting position of the rear embedded part is rechecked, and the steel plate is used for position calibration when the mounting position does not meet the design requirement, so that the mounting position precision and the mounting precision of the embedded part are improved.
本发明涉及建筑施工技术领域,具体为一种建筑幕墙施工方法,包括:S1,测量放线;S2,后置埋件偏差处理;S3,立柱安装;S4,避雷接地安装;S5,横梁安装;S6,玻璃板安装对玻璃板中的铝框及玻璃面板进行清洁,在前侧玻璃面上粘贴保护纸,将玻璃板提升到安装位置,先进行铝框下部就位安装并利用螺栓进行临时固定,待铝框上部就位插接并进行核准调整后,利用螺栓收紧固定。通过对后置埋件的安装位置进行复检并安装位置不符合设计要求时利用钢板进行位置校准,提高预埋件安装位置精度及安装精度。
Building curtain wall construction method
The invention relates to the technical field of building construction, in particular to a building curtain wall construction method which comprises the following steps: S1, surveying and setting out; s2, performing deviation treatment on the rear embedded part; s3, mounting a stand column; s4, lightning-protection grounding installation is carried out; s5, cross beam installation; s6, mounting the glass plate, namely cleaning an aluminum frame and a glass panel in the glass plate, pasting protective paper on a front side glass surface, lifting the glass plate to a mounting position, mounting the lower part of the aluminum frame in place, temporarily fixing the aluminum frame by using bolts, and tightening and fixing the aluminum frame by using bolts after the upper part of the aluminum frame is inserted in place and approved and adjusted. The mounting position of the rear embedded part is rechecked, and the steel plate is used for position calibration when the mounting position does not meet the design requirement, so that the mounting position precision and the mounting precision of the embedded part are improved.
本发明涉及建筑施工技术领域,具体为一种建筑幕墙施工方法,包括:S1,测量放线;S2,后置埋件偏差处理;S3,立柱安装;S4,避雷接地安装;S5,横梁安装;S6,玻璃板安装对玻璃板中的铝框及玻璃面板进行清洁,在前侧玻璃面上粘贴保护纸,将玻璃板提升到安装位置,先进行铝框下部就位安装并利用螺栓进行临时固定,待铝框上部就位插接并进行核准调整后,利用螺栓收紧固定。通过对后置埋件的安装位置进行复检并安装位置不符合设计要求时利用钢板进行位置校准,提高预埋件安装位置精度及安装精度。
Building curtain wall construction method
建筑幕墙施工方法
GAO ZHENGYONG (Autor:in) / CHEN FAN (Autor:in) / ZHANG TANKUI (Autor:in) / LI MINGHANG (Autor:in) / XU TAO (Autor:in) / XIA HUICHENG (Autor:in) / WU TIANBIN (Autor:in) / CHEN TIANJIAO (Autor:in)
11.10.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Building curtain wall and construction method thereof
Europäisches Patentamt | 2023
|Curtain wall construction device for building construction
Europäisches Patentamt | 2023
|Building wall curtain wall construction device and construction method thereof
Europäisches Patentamt | 2023
|Building curtain wall and construction method thereof
Europäisches Patentamt | 2022
|