Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel beam and concrete filled steel tube bundle combined member
The invention discloses a steel beam and concrete filled steel tube bundle combined member, and particularly relates to the field of steel beams, the steel beam is arranged on one side of the concrete beam, a floor support plate is fixedly mounted on one side of the steel beam, shear nails are welded on one side of the floor support plate, and the shear nails are fixedly mounted in the concrete beam. A limiting box is fixedly connected to the top of the steel beam, a movable steel ball is arranged in the limiting box, a movable plate is arranged on one side of the movable steel ball, the movable plate is slidably connected to the interior of the limiting box, a movable column is fixedly connected to one side of the movable plate, and a supporting plate is slidably connected to the outer wall of the movable column. By arranging a movable steel ball and an extrusion air bag, when an earthquake occurs, the movable steel ball extrudes a movable plate, the movable plate drives a corresponding piston to extrude a piston barrel, finally, an extrusion plate extrudes and fixes a shear nail, and the problem that the shear nail shakes and falls off during the earthquake, so that a steel beam falls off, and huge potential safety hazards exist is solved.
本发明公开了钢梁与钢管混凝土束组合构件,具体涉及钢梁领域,包括混凝土束和钢梁,钢梁设在混凝土束的一侧,钢梁的一侧固定安装有楼承板,楼承板的一侧焊接有剪力钉,剪力钉固定安装在混凝土束的内部,钢梁的顶部固定连接有限位盒,限位盒的内部设有活动钢球,活动钢球的一侧设有活动板,活动板滑动连接在限位盒的内部,活动板的一侧固定连接有活动柱,活动柱的外壁滑动连接有支撑板。本发明通过设置了活动钢球和挤压气囊,当发生地震时,活动钢球就会挤压活动板,活动板就会带动对应型活塞挤压活塞筒,最终使挤压板对剪力钉进行挤压固定,解决了地震时剪力钉发生晃动脱落导致钢梁掉落存在巨大安全隐患的问题。
Steel beam and concrete filled steel tube bundle combined member
The invention discloses a steel beam and concrete filled steel tube bundle combined member, and particularly relates to the field of steel beams, the steel beam is arranged on one side of the concrete beam, a floor support plate is fixedly mounted on one side of the steel beam, shear nails are welded on one side of the floor support plate, and the shear nails are fixedly mounted in the concrete beam. A limiting box is fixedly connected to the top of the steel beam, a movable steel ball is arranged in the limiting box, a movable plate is arranged on one side of the movable steel ball, the movable plate is slidably connected to the interior of the limiting box, a movable column is fixedly connected to one side of the movable plate, and a supporting plate is slidably connected to the outer wall of the movable column. By arranging a movable steel ball and an extrusion air bag, when an earthquake occurs, the movable steel ball extrudes a movable plate, the movable plate drives a corresponding piston to extrude a piston barrel, finally, an extrusion plate extrudes and fixes a shear nail, and the problem that the shear nail shakes and falls off during the earthquake, so that a steel beam falls off, and huge potential safety hazards exist is solved.
本发明公开了钢梁与钢管混凝土束组合构件,具体涉及钢梁领域,包括混凝土束和钢梁,钢梁设在混凝土束的一侧,钢梁的一侧固定安装有楼承板,楼承板的一侧焊接有剪力钉,剪力钉固定安装在混凝土束的内部,钢梁的顶部固定连接有限位盒,限位盒的内部设有活动钢球,活动钢球的一侧设有活动板,活动板滑动连接在限位盒的内部,活动板的一侧固定连接有活动柱,活动柱的外壁滑动连接有支撑板。本发明通过设置了活动钢球和挤压气囊,当发生地震时,活动钢球就会挤压活动板,活动板就会带动对应型活塞挤压活塞筒,最终使挤压板对剪力钉进行挤压固定,解决了地震时剪力钉发生晃动脱落导致钢梁掉落存在巨大安全隐患的问题。
Steel beam and concrete filled steel tube bundle combined member
钢梁与钢管混凝土束组合构件
SHI JIANJUN (Autor:in) / CUI XUELONG (Autor:in) / WANG SHIJUN (Autor:in) / YIN HAILONG (Autor:in) / ZHANG CHONG (Autor:in)
14.10.2022
Patent
Elektronische Ressource
Chinesisch
Steel beam and concrete filled steel tube bundle combined steel member
Europäisches Patentamt | 2022
|Steel tube bundle-corrugated steel plate concrete combined column
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|