Mass concrete construction maintenance system and construction method thereof
The mass concrete construction curing system comprises a concrete layer, a cooling water pipe is installed in the concrete layer, and the cooling pipe is provided with a water inlet and a water outlet in the concrete layer; the cooling mechanism comprises a fixed shell, a compressor is installed in the fixed shell, the compressor comprises a high-pressure port, a low-pressure port and an air adding port, an evaporator is installed at the low-pressure port of the compressor, a condenser, a filter, a pipe frame piece and the evaporator are sequentially installed, the evaporator is installed in the movable water tank, and a high-pressure copper pipe is installed at the other end of the evaporator; and the other end of the high-pressure copper pipe is connected with a high-pressure copper pipe of the compressor. The technical problems that the internal temperature of the concrete layer is high, water circulation internal cooling is uneven, a cooling maintenance system with independent water circulation needs to be provided, and a water storage pond needs to be dug for continuously cooling the concrete layer are solved.
本发明公开了一种大体积混凝土施工养护系统及其施工方法,包括混凝土层,混凝土层内安装有冷却水管,冷却管在混凝土层上分别设置有进水口和出水口;冷却机构,冷却机构包括固定壳,固定壳内安装有压缩机,压缩机包括高压端口、低压端口和加气口,压缩机的低压端口安装有蒸发器,后依次安装冷凝器、过滤器、管架件和蒸发器,蒸发器安装在移动水箱内,蒸发器的另一端安装有高压铜管,高压铜管的另一端与压缩机的高压铜管相连接。本发明解决了混凝土层的内部温度较高,水循环内部降温不均匀,需要提供单独水循环的冷却养护系统,其中需要挖设储水池,来持续对混凝土层降温的技术问题。
Mass concrete construction maintenance system and construction method thereof
The mass concrete construction curing system comprises a concrete layer, a cooling water pipe is installed in the concrete layer, and the cooling pipe is provided with a water inlet and a water outlet in the concrete layer; the cooling mechanism comprises a fixed shell, a compressor is installed in the fixed shell, the compressor comprises a high-pressure port, a low-pressure port and an air adding port, an evaporator is installed at the low-pressure port of the compressor, a condenser, a filter, a pipe frame piece and the evaporator are sequentially installed, the evaporator is installed in the movable water tank, and a high-pressure copper pipe is installed at the other end of the evaporator; and the other end of the high-pressure copper pipe is connected with a high-pressure copper pipe of the compressor. The technical problems that the internal temperature of the concrete layer is high, water circulation internal cooling is uneven, a cooling maintenance system with independent water circulation needs to be provided, and a water storage pond needs to be dug for continuously cooling the concrete layer are solved.
本发明公开了一种大体积混凝土施工养护系统及其施工方法,包括混凝土层,混凝土层内安装有冷却水管,冷却管在混凝土层上分别设置有进水口和出水口;冷却机构,冷却机构包括固定壳,固定壳内安装有压缩机,压缩机包括高压端口、低压端口和加气口,压缩机的低压端口安装有蒸发器,后依次安装冷凝器、过滤器、管架件和蒸发器,蒸发器安装在移动水箱内,蒸发器的另一端安装有高压铜管,高压铜管的另一端与压缩机的高压铜管相连接。本发明解决了混凝土层的内部温度较高,水循环内部降温不均匀,需要提供单独水循环的冷却养护系统,其中需要挖设储水池,来持续对混凝土层降温的技术问题。
Mass concrete construction maintenance system and construction method thereof
一种大体积混凝土施工养护系统及其施工方法
GUO SHENGQUAN (Autor:in) / QIAN YUANDI (Autor:in) / LEI TUANJIE (Autor:in) / TIAN MIN (Autor:in) / YANG DEFU (Autor:in) / WANG YE (Autor:in) / WANG XIAOPING (Autor:in)
14.10.2022
Patent
Elektronische Ressource
Chinesisch
Mass concrete raft construction and maintenance device and method thereof
Europäisches Patentamt | 2023
|Concrete winter construction maintenance equipment and construction method thereof
Europäisches Patentamt | 2022
|Subtropical zone mass concrete construction and maintenance method
Europäisches Patentamt | 2021
|Concrete maintenance device for building construction and maintenance method thereof
Europäisches Patentamt | 2023
|