Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sponge city permeable ground and pouring method thereof
The invention discloses a sponge city permeable ground and a pouring method thereof.The sponge city permeable ground comprises clean coarse aggregate, coarse gravel, fine gravel, high-grade cement, a cementation enhancer, a surface layer protective agent, color pigment and water, the area of the permeable ground needing to be poured is measured after materials are prepared, the measured base layer is permeable, stricken and then leveled, and then the surface layer is poured into the permeable ground. Paving coarse aggregate on the leveled ground, compacting, preparing the prepared materials according to the proportion, putting the prepared materials into water, uniformly stirring, manually paving the ground, scraping by using a floating rule, vibrating by using a vibrating pump, scraping again by using a floating rule, troweling, paving, leveling and compacting the poured ground by using a paver, trimming the permeable pavement, and finally, paving the pavement by using a paving machine. A soft cotton yarn layer is laid on the outer portion of the poured permeable floor, regular permeable maintenance is conducted, telescopic gaps are cut in the floor, exposed aggregate on the road surface is washed out through a fine grinding wheel, plastic cloth is laid on the surface of the road surface after clean water is used for washing, and a sealing agent is sprayed. The permeable floor is good in water permeability, high in water permeability efficiency and long in service life.
本发明公开了一种海绵城市透水地面及其浇筑方法,包括洁净的粗骨料、粗砂石、细砂石、高标号水泥、胶结增强剂、面层保护剂、彩色颜料、水,准备好材料后测量需要浇筑的透水地面的面积,将测量好的基层透水后刮平后再整平,整平后的地面铺上粗骨料压实,将准备好的材料按照比例配置后放入水中搅拌均匀,人工摊铺地面后采用刮尺刮平后采用震动泵震动后采用刮尺再次刮平,采用摊铺机将浇筑的地面抹光、摊铺、整平、压实,对路面透水进行修边,浇筑好的透水避免的外部铺上一层软棉纱层定期透水养护,将地面切割伸缩缝隙,采用精细磨轮洗出路面的露骨料,采用清水冲洗干净后在路面表面铺上塑料布并喷涂封闭剂,该透水地面的透水性好,透水效率高,而且地面的使用寿命长。
Sponge city permeable ground and pouring method thereof
The invention discloses a sponge city permeable ground and a pouring method thereof.The sponge city permeable ground comprises clean coarse aggregate, coarse gravel, fine gravel, high-grade cement, a cementation enhancer, a surface layer protective agent, color pigment and water, the area of the permeable ground needing to be poured is measured after materials are prepared, the measured base layer is permeable, stricken and then leveled, and then the surface layer is poured into the permeable ground. Paving coarse aggregate on the leveled ground, compacting, preparing the prepared materials according to the proportion, putting the prepared materials into water, uniformly stirring, manually paving the ground, scraping by using a floating rule, vibrating by using a vibrating pump, scraping again by using a floating rule, troweling, paving, leveling and compacting the poured ground by using a paver, trimming the permeable pavement, and finally, paving the pavement by using a paving machine. A soft cotton yarn layer is laid on the outer portion of the poured permeable floor, regular permeable maintenance is conducted, telescopic gaps are cut in the floor, exposed aggregate on the road surface is washed out through a fine grinding wheel, plastic cloth is laid on the surface of the road surface after clean water is used for washing, and a sealing agent is sprayed. The permeable floor is good in water permeability, high in water permeability efficiency and long in service life.
本发明公开了一种海绵城市透水地面及其浇筑方法,包括洁净的粗骨料、粗砂石、细砂石、高标号水泥、胶结增强剂、面层保护剂、彩色颜料、水,准备好材料后测量需要浇筑的透水地面的面积,将测量好的基层透水后刮平后再整平,整平后的地面铺上粗骨料压实,将准备好的材料按照比例配置后放入水中搅拌均匀,人工摊铺地面后采用刮尺刮平后采用震动泵震动后采用刮尺再次刮平,采用摊铺机将浇筑的地面抹光、摊铺、整平、压实,对路面透水进行修边,浇筑好的透水避免的外部铺上一层软棉纱层定期透水养护,将地面切割伸缩缝隙,采用精细磨轮洗出路面的露骨料,采用清水冲洗干净后在路面表面铺上塑料布并喷涂封闭剂,该透水地面的透水性好,透水效率高,而且地面的使用寿命长。
Sponge city permeable ground and pouring method thereof
一种海绵城市透水地面及其浇筑方法
XU XIAOHUA (Autor:in)
21.10.2022
Patent
Elektronische Ressource
Chinesisch
Pouring equipment and pouring method for permeable ground of sponge city
Europäisches Patentamt | 2023
|Ground permeable water storage structure of sponge city
Europäisches Patentamt | 2024
|Permeable pavement for sponge city and construction method thereof
Europäisches Patentamt | 2022
|Sponge city permeable road and construction process thereof
Europäisches Patentamt | 2020
|Sponge city permeable road and construction process thereof
Europäisches Patentamt | 2021
|