Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Composite structure of concrete filled steel tube composite column and reinforced concrete beam
The invention discloses a composite structure of a concrete filled steel tube composite column and a reinforced concrete beam, which comprises a composite column and a concrete beam reinforcing steel bar, a plurality of studs are uniformly arranged on the outer surface of the composite column, a plurality of main reinforcement positioning plates are arranged on the outer side of the composite column, the main reinforcement positioning plates are perpendicular to the surface of the composite column, and the concrete beam reinforcing steel bar is arranged on the concrete beam reinforcing steel bar. The main reinforcement positioning plate is perpendicular to the length direction of the composite column, and the end of the concrete beam reinforcement is welded and fixed to the composite column. The vertical rib has the beneficial effects that the main rib positioning plate arranged in the horizontal direction is adopted, and compared with an existing vertical rib, the end of a concrete beam steel bar can be borne when the concrete beam steel bar is welded, so that welding operation is facilitated, and the welding machining efficiency is improved; the vertical stressed steel bars are positioned on the main bar positioning plate, so that the mounting, fixing and positioning efficiency of the vertical stressed steel bars for manufacturing the reinforcement cage can be greatly improved, the reinforcement cage is convenient to erect, the construction efficiency of the reinforcement cage is improved, the position deviation of the reinforcement cage is smaller, and the stability is better.
本发明公开了一种钢管混凝土叠合柱与钢筋混凝土梁的组合结构,包括叠合柱和混凝土梁钢筋,所述叠合柱的外表面均匀设置有若干栓钉,所述叠合柱的外侧设置有多块主筋定位板,所述主筋定位板与所述叠合柱表面垂直,且该主筋定位板与所述叠合柱的长度方向相互垂直,所述混凝土梁钢筋的端部与所述叠合柱焊接固定。有益效果在于:通过采用水平方向布置的主筋定位板,较现有的竖肋,在焊接混凝土梁钢筋时可承载其端部,从而方便焊接操作,提高焊接加工效率;通过在主筋定位板上对竖向受力钢筋定位,可大大提高制作钢筋笼的竖向受力钢筋的安装固定和定位效率,方便钢筋笼的架设,提高钢筋笼的施工效率,且钢筋笼的位置偏差更小,稳定性更好。
Composite structure of concrete filled steel tube composite column and reinforced concrete beam
The invention discloses a composite structure of a concrete filled steel tube composite column and a reinforced concrete beam, which comprises a composite column and a concrete beam reinforcing steel bar, a plurality of studs are uniformly arranged on the outer surface of the composite column, a plurality of main reinforcement positioning plates are arranged on the outer side of the composite column, the main reinforcement positioning plates are perpendicular to the surface of the composite column, and the concrete beam reinforcing steel bar is arranged on the concrete beam reinforcing steel bar. The main reinforcement positioning plate is perpendicular to the length direction of the composite column, and the end of the concrete beam reinforcement is welded and fixed to the composite column. The vertical rib has the beneficial effects that the main rib positioning plate arranged in the horizontal direction is adopted, and compared with an existing vertical rib, the end of a concrete beam steel bar can be borne when the concrete beam steel bar is welded, so that welding operation is facilitated, and the welding machining efficiency is improved; the vertical stressed steel bars are positioned on the main bar positioning plate, so that the mounting, fixing and positioning efficiency of the vertical stressed steel bars for manufacturing the reinforcement cage can be greatly improved, the reinforcement cage is convenient to erect, the construction efficiency of the reinforcement cage is improved, the position deviation of the reinforcement cage is smaller, and the stability is better.
本发明公开了一种钢管混凝土叠合柱与钢筋混凝土梁的组合结构,包括叠合柱和混凝土梁钢筋,所述叠合柱的外表面均匀设置有若干栓钉,所述叠合柱的外侧设置有多块主筋定位板,所述主筋定位板与所述叠合柱表面垂直,且该主筋定位板与所述叠合柱的长度方向相互垂直,所述混凝土梁钢筋的端部与所述叠合柱焊接固定。有益效果在于:通过采用水平方向布置的主筋定位板,较现有的竖肋,在焊接混凝土梁钢筋时可承载其端部,从而方便焊接操作,提高焊接加工效率;通过在主筋定位板上对竖向受力钢筋定位,可大大提高制作钢筋笼的竖向受力钢筋的安装固定和定位效率,方便钢筋笼的架设,提高钢筋笼的施工效率,且钢筋笼的位置偏差更小,稳定性更好。
Composite structure of concrete filled steel tube composite column and reinforced concrete beam
一种钢管混凝土叠合柱与钢筋混凝土梁的组合结构
YAN YIFEI (Autor:in) / LIU WANGYUE (Autor:in) / ZHAN WEIHUA (Autor:in) / CHEN XIANGWEI (Autor:in) / ZHANG SHUAI (Autor:in) / YU HAO (Autor:in) / ZHANG HANG (Autor:in) / LI YAPENG (Autor:in)
21.10.2022
Patent
Elektronische Ressource
Chinesisch
Concrete-filled steel tube composite column reinforced concrete beam joint structure
Europäisches Patentamt | 2021
|Concrete-filled steel tube column-reinforced concrete beam joint connection method
Europäisches Patentamt | 2015
|Novel connecting joint of concrete filled steel tube composite column and concrete beam
Europäisches Patentamt | 2024
|Partially-fabricated concrete-filled steel tube composite column-steel beam combined joint
Europäisches Patentamt | 2021
|