Construction method for integral hoisting system of grid unit truss
The invention discloses a construction method of a grid unit truss integral hoisting system, and relates to the technical field of constructional engineering. The construction method of the integral hoisting system of the grid unit truss comprises the following specific operations: S1, configuring grid unit truss materials with corresponding sizes according to the requirements of a design drawing, prefabricating grid unit truss structure segments in a factory-like manner, leaving a factory after passing inspection, and transporting the grid unit truss structure segments to a construction site. The construction method of the integral hoisting system of the grid unit truss is mainly applied to unfolding and introduction of a roof supporting system of a steel structure factory building. In the installation process, the mode that a grid unit truss overall structure system and a main body frame beam structure are synchronously hoisted is adopted, the construction procedures such as connection of the grid unit truss and a main body beam body are all completed on the ground, the high-altitude operation time of the procedures is shortened, the construction technology is improved to a large extent, and the construction safety is further improved.
本发明公开了一种网格单元桁架整体吊装体系施工方法,涉及建筑工程技术领域。该网格单元桁架整体吊装体系施工方法,具体操作如下:S1、根据设计图纸要求,配置相应尺寸大小的网格单元桁架材料,通过工厂化预制网格单元桁架结构分段,经检验合格后出厂,运抵施工现场。该网格单元桁架整体吊装体系施工方法,采用的网格单元桁架整体吊装体系施工方法,主要就应用于钢结构厂房屋面支撑体系展开介绍。在安装过程中,采用网格单元桁架整体结构体系与主体框架梁结构同步吊装的方式,网格单元桁架与主体梁体连接等施工工序均在地面完成,减少了该工序高空作业时间,较大程度上改进施工工艺,进一步提升施工安全性。
Construction method for integral hoisting system of grid unit truss
The invention discloses a construction method of a grid unit truss integral hoisting system, and relates to the technical field of constructional engineering. The construction method of the integral hoisting system of the grid unit truss comprises the following specific operations: S1, configuring grid unit truss materials with corresponding sizes according to the requirements of a design drawing, prefabricating grid unit truss structure segments in a factory-like manner, leaving a factory after passing inspection, and transporting the grid unit truss structure segments to a construction site. The construction method of the integral hoisting system of the grid unit truss is mainly applied to unfolding and introduction of a roof supporting system of a steel structure factory building. In the installation process, the mode that a grid unit truss overall structure system and a main body frame beam structure are synchronously hoisted is adopted, the construction procedures such as connection of the grid unit truss and a main body beam body are all completed on the ground, the high-altitude operation time of the procedures is shortened, the construction technology is improved to a large extent, and the construction safety is further improved.
本发明公开了一种网格单元桁架整体吊装体系施工方法,涉及建筑工程技术领域。该网格单元桁架整体吊装体系施工方法,具体操作如下:S1、根据设计图纸要求,配置相应尺寸大小的网格单元桁架材料,通过工厂化预制网格单元桁架结构分段,经检验合格后出厂,运抵施工现场。该网格单元桁架整体吊装体系施工方法,采用的网格单元桁架整体吊装体系施工方法,主要就应用于钢结构厂房屋面支撑体系展开介绍。在安装过程中,采用网格单元桁架整体结构体系与主体框架梁结构同步吊装的方式,网格单元桁架与主体梁体连接等施工工序均在地面完成,减少了该工序高空作业时间,较大程度上改进施工工艺,进一步提升施工安全性。
Construction method for integral hoisting system of grid unit truss
一种网格单元桁架整体吊装体系施工方法
JIANG FUSHENG (Autor:in) / YUE JIE (Autor:in) / LI HUANHUAN (Autor:in)
25.10.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of complex space truss integral hoisting system
Europäisches Patentamt | 2022
|Integral hoisting construction method for steel structure grid
Europäisches Patentamt | 2021
|