Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for bridge construction double-limb pier column
The invention relates to the technical field of constructional engineering, and discloses a construction method of a bridge construction double-limb pier stud, which comprises the following steps: step 1, positioning and paying off, step 2, chiseling treatment, step 3, building of a bracket and a working platform, step 4, binding of reinforcing steel bars, step 5, formwork erecting, step 6, concrete pouring and step 7, concrete curing. The joint position is fixed through the bolt, the right triangle block is arranged below the bolt to guarantee the abutting stability, the butt joint stability between the formworks is improved, meanwhile, later dismantling is facilitated, the T-shaped positioning column is arranged between the double-pier-column formworks, the distance between the two formworks is changed, and meanwhile positioning is achieved through bolt fixing, so that the construction efficiency is improved, and the construction cost is reduced. Therefore, the distance between the formworks is stable, and the accuracy of pier column pouring is improved.
本发明涉及建筑工程技术领域,且公开了一种桥梁施工双肢墩柱的施工方法,包括步骤一:定位放线,步骤二:凿毛处理,步骤三:支架及工作平台的搭建,步骤四:钢筋绑扎,步骤五:支模,步骤六:混凝土浇筑,步骤七:混凝土养护,本方案,通过在接缝位置处采用螺栓进行固定,且螺栓下方设置直角三角形块保证抵触的稳定性,提升模板之间对接的稳定性,同时便于后期的拆除,双墩柱模板的之间设置T形定位柱,改变两个模板之间间距,同时通过螺栓固定实现定位,以保证模板之间间距稳定,提升墩柱浇筑时的精度。
Construction method for bridge construction double-limb pier column
The invention relates to the technical field of constructional engineering, and discloses a construction method of a bridge construction double-limb pier stud, which comprises the following steps: step 1, positioning and paying off, step 2, chiseling treatment, step 3, building of a bracket and a working platform, step 4, binding of reinforcing steel bars, step 5, formwork erecting, step 6, concrete pouring and step 7, concrete curing. The joint position is fixed through the bolt, the right triangle block is arranged below the bolt to guarantee the abutting stability, the butt joint stability between the formworks is improved, meanwhile, later dismantling is facilitated, the T-shaped positioning column is arranged between the double-pier-column formworks, the distance between the two formworks is changed, and meanwhile positioning is achieved through bolt fixing, so that the construction efficiency is improved, and the construction cost is reduced. Therefore, the distance between the formworks is stable, and the accuracy of pier column pouring is improved.
本发明涉及建筑工程技术领域,且公开了一种桥梁施工双肢墩柱的施工方法,包括步骤一:定位放线,步骤二:凿毛处理,步骤三:支架及工作平台的搭建,步骤四:钢筋绑扎,步骤五:支模,步骤六:混凝土浇筑,步骤七:混凝土养护,本方案,通过在接缝位置处采用螺栓进行固定,且螺栓下方设置直角三角形块保证抵触的稳定性,提升模板之间对接的稳定性,同时便于后期的拆除,双墩柱模板的之间设置T形定位柱,改变两个模板之间间距,同时通过螺栓固定实现定位,以保证模板之间间距稳定,提升墩柱浇筑时的精度。
Construction method for bridge construction double-limb pier column
一种桥梁施工双肢墩柱的施工方法
GU WEN (Autor:in) / ZHU YUNSHAN (Autor:in)
01.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken