Lock mouth steel pipe pile, guide frame structure and method for constructing lock mouth steel pipe pile
The invention discloses a fore shaft steel pipe pile, a guide frame structure and a method for constructing the fore shaft steel pipe pile, and relates to the technical field of bridge cofferdam construction.The fore shaft steel pipe pile comprises a steel pipe pile body and two steel pipe pile fore shafts, and the two steel pipe pile fore shafts are fixedly arranged on the two sides of the steel pipe pile body; the length of at least one steel pipe pile locking opening is smaller than that of the steel pipe pile body. According to the locking steel pipe pile, the two steel pipe pile locking openings are formed in the two sides of the steel pipe pile body, and the length of at least one steel pipe pile locking opening is smaller than that of the steel pipe pile body, so that on one hand, the length of the steel pipe pile locking openings of the locking steel pipe pile can be effectively reduced, the locking opening manufacturing engineering amount is reduced, and the construction cost is reduced; and on the other hand, by reducing the locking connection length of the steel pipe piles, the inserting and driving difficulty of the locking steel pipe piles can be reduced.
本发明公开了一种锁口钢管桩、导向架结构及施工锁口钢管桩的方法,涉及桥梁围堰施工技术领域,所述锁口钢管桩包括:钢管桩本体和两个钢管桩锁口,两个所述钢管桩锁口固设于所述钢管桩本体的两侧,且至少一个所述钢管桩锁口的长度小于所述钢管桩本体的长度。本发明的锁口钢管桩,在钢管桩本体的两侧设置两个钢管桩锁口,且至少一个所述钢管桩锁口的长度小于所述钢管桩本体的长度:一方面能够有效地节约锁口钢管桩的钢管桩锁口长度,节约锁口制造工程量,节约施工成本;另一方面通过降低钢管桩锁口连接长度,还可以降低锁口钢管桩的插打难度。
Lock mouth steel pipe pile, guide frame structure and method for constructing lock mouth steel pipe pile
The invention discloses a fore shaft steel pipe pile, a guide frame structure and a method for constructing the fore shaft steel pipe pile, and relates to the technical field of bridge cofferdam construction.The fore shaft steel pipe pile comprises a steel pipe pile body and two steel pipe pile fore shafts, and the two steel pipe pile fore shafts are fixedly arranged on the two sides of the steel pipe pile body; the length of at least one steel pipe pile locking opening is smaller than that of the steel pipe pile body. According to the locking steel pipe pile, the two steel pipe pile locking openings are formed in the two sides of the steel pipe pile body, and the length of at least one steel pipe pile locking opening is smaller than that of the steel pipe pile body, so that on one hand, the length of the steel pipe pile locking openings of the locking steel pipe pile can be effectively reduced, the locking opening manufacturing engineering amount is reduced, and the construction cost is reduced; and on the other hand, by reducing the locking connection length of the steel pipe piles, the inserting and driving difficulty of the locking steel pipe piles can be reduced.
本发明公开了一种锁口钢管桩、导向架结构及施工锁口钢管桩的方法,涉及桥梁围堰施工技术领域,所述锁口钢管桩包括:钢管桩本体和两个钢管桩锁口,两个所述钢管桩锁口固设于所述钢管桩本体的两侧,且至少一个所述钢管桩锁口的长度小于所述钢管桩本体的长度。本发明的锁口钢管桩,在钢管桩本体的两侧设置两个钢管桩锁口,且至少一个所述钢管桩锁口的长度小于所述钢管桩本体的长度:一方面能够有效地节约锁口钢管桩的钢管桩锁口长度,节约锁口制造工程量,节约施工成本;另一方面通过降低钢管桩锁口连接长度,还可以降低锁口钢管桩的插打难度。
Lock mouth steel pipe pile, guide frame structure and method for constructing lock mouth steel pipe pile
锁口钢管桩、导向架结构及施工锁口钢管桩的方法
MAO WEIQI (Autor:in) / LIU JIEWEN (Autor:in) / DAI HAO (Autor:in) / JIANG BENJUN (Autor:in) / ZHANG DEZHI (Autor:in) / WANG NIANCHAO (Autor:in) / MA LIXIN (Autor:in) / KIM IN-WOONG (Autor:in) / YAN JIE (Autor:in) / ZHANG DONG (Autor:in)
01.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Lock catch steel pipe pile cofferdam guide hole construction method
Europäisches Patentamt | 2023
|STEEL PIPE PILE AND METHOD FOR CONSTRUCTING STEEL PIPE PILE
Europäisches Patentamt | 2024
|Lock catch steel pipe pile and cofferdam construction method
Europäisches Patentamt | 2023
|Construction method of lock port steel pipe pile cofferdam
Europäisches Patentamt | 2021
|