Construction method of offshore wind power single-pile composite foundation with shallow covering layer and composite foundation thereof
The invention discloses an offshore wind power single-pile composite foundation construction method of a shallow covering layer and a composite foundation thereof. The construction method comprises the following steps that S1, the supporting structure is anchored to a seabed foundation covering layer; s2, the pile stabilizing platform is detachably and fixedly installed on the supporting structure; s3, after the single pile is moved into the pile gripper of the pile stabilizing platform, the single pile is further lowered, and the single pile penetrates through the guide cylinder and is immersed to the mud surface; the pile gripper holds the single pile and adjusts the pile body perpendicularity of the single pile; s4, the single pile is driven to the designed depth; s5, the soil body in the fixed medium containing cavity is removed; then, a fixing medium used for connecting the single pile and the supporting structure is poured into the fixing medium containing cavity, so that the single-pile composite foundation structure is formed; and S6, the pile stabilizing platform is detached from the supporting structure. By means of the structure, the problems that in the prior art, the construction cost of a shallow covering layer and a soft soil foundation seabed is high, and the construction period is long can be effectively solved.
浅覆盖层的海上风电单桩复合基础施工方法及其复合基础。上述施工方法,包括以下步骤:S1,将支撑结构锚固于海床地基覆盖层;S2,将稳桩平台可拆卸地固定安装在支撑结构上;S3,将单桩移入稳桩平台的抱桩器内后,进一步下放单桩,单桩穿过导向筒并沉放至泥面;抱桩器抱紧单桩并调整单桩的桩身垂直度;S4,单桩打入至设计深度;S5,清除固定介质容置腔中的土体;之后,向固定介质容置腔内灌注用于连接单桩和支撑结构的固定介质,以形成单桩复合基础结构;S6,将稳桩平台从支撑结构上拆卸。通过上述结构可以有效地解决现有技术中得浅覆盖层、软土地基海床的施工成本高,且建设周期长的问题。
Construction method of offshore wind power single-pile composite foundation with shallow covering layer and composite foundation thereof
The invention discloses an offshore wind power single-pile composite foundation construction method of a shallow covering layer and a composite foundation thereof. The construction method comprises the following steps that S1, the supporting structure is anchored to a seabed foundation covering layer; s2, the pile stabilizing platform is detachably and fixedly installed on the supporting structure; s3, after the single pile is moved into the pile gripper of the pile stabilizing platform, the single pile is further lowered, and the single pile penetrates through the guide cylinder and is immersed to the mud surface; the pile gripper holds the single pile and adjusts the pile body perpendicularity of the single pile; s4, the single pile is driven to the designed depth; s5, the soil body in the fixed medium containing cavity is removed; then, a fixing medium used for connecting the single pile and the supporting structure is poured into the fixing medium containing cavity, so that the single-pile composite foundation structure is formed; and S6, the pile stabilizing platform is detached from the supporting structure. By means of the structure, the problems that in the prior art, the construction cost of a shallow covering layer and a soft soil foundation seabed is high, and the construction period is long can be effectively solved.
浅覆盖层的海上风电单桩复合基础施工方法及其复合基础。上述施工方法,包括以下步骤:S1,将支撑结构锚固于海床地基覆盖层;S2,将稳桩平台可拆卸地固定安装在支撑结构上;S3,将单桩移入稳桩平台的抱桩器内后,进一步下放单桩,单桩穿过导向筒并沉放至泥面;抱桩器抱紧单桩并调整单桩的桩身垂直度;S4,单桩打入至设计深度;S5,清除固定介质容置腔中的土体;之后,向固定介质容置腔内灌注用于连接单桩和支撑结构的固定介质,以形成单桩复合基础结构;S6,将稳桩平台从支撑结构上拆卸。通过上述结构可以有效地解决现有技术中得浅覆盖层、软土地基海床的施工成本高,且建设周期长的问题。
Construction method of offshore wind power single-pile composite foundation with shallow covering layer and composite foundation thereof
浅覆盖层的海上风电单桩复合基础施工方法及其复合基础
WANG WEI (Autor:in) / ZHANG ZECHAO (Autor:in) / YU GUANGMING (Autor:in)
04.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|Offshore wind power single pile foundation and construction method thereof
Europäisches Patentamt | 2024
|