Rail-mounted lifting platform and rail-mounted hanging bracket integrated system
The rail type lifting platform and rail type hanging bracket integrated system comprises a first rail and a second rail which are fixed to a main body structure, the first rail is located on the outermost side of the main body structure, and the second rail is located on the opposite inner side of the main body structure; an overhanging support arm is arranged at the top of the hanging bracket, and a first walking wheel matched with the first track to slide is mounted at the end part of the overhanging support arm; the hanger anti-derailment device comprises a first anti-overturning wheel and an anti-derailment limiting bearing which are installed on the two sides of the first walking wheel, and the first anti-overturning wheel and the anti-derailment limiting bearing relatively slide on the two sides of the first rail; the bottom of the lifting platform is provided with a second walking wheel which is matched with the second track to slide; the lifting platform anti-overturning device comprises a second anti-overturning wheel which is installed on the outer side of the second walking wheel and slides in cooperation with the second rail. The hanging bracket system does not occupy outdoor engineering sites, outdoor engineering can be inserted in advance for construction, and the overall construction period is shortened.
本发明公开了一种轨道式升降平台与轨道式吊架一体化系统,包括:固定于主体结构上的第一轨道和第二轨道,第一轨道位于主体结构最外侧,第二轨道位于主体结构的相对内侧;吊架的顶部设有悬挑支臂,悬挑支臂的端部安装有与第一轨道配合滑动的第一行走轮;吊架防脱轨装置,包括安装于第一行走轮两侧的第一防倾覆轮和防脱轨限位轴承,第一防倾覆轮和防脱轨限位轴承相对滑动于第一轨道的两侧;升降平台,升降平台的底部安装有与第二轨道配合滑动的第二行走轮;升降平台防倾覆装置,包括安装于第二行走轮外侧且与第二轨道配合滑动的第二防倾覆轮。吊架系统不占用室外工程场地,室外工程可提前插入施工,缩短整体工期。
Rail-mounted lifting platform and rail-mounted hanging bracket integrated system
The rail type lifting platform and rail type hanging bracket integrated system comprises a first rail and a second rail which are fixed to a main body structure, the first rail is located on the outermost side of the main body structure, and the second rail is located on the opposite inner side of the main body structure; an overhanging support arm is arranged at the top of the hanging bracket, and a first walking wheel matched with the first track to slide is mounted at the end part of the overhanging support arm; the hanger anti-derailment device comprises a first anti-overturning wheel and an anti-derailment limiting bearing which are installed on the two sides of the first walking wheel, and the first anti-overturning wheel and the anti-derailment limiting bearing relatively slide on the two sides of the first rail; the bottom of the lifting platform is provided with a second walking wheel which is matched with the second track to slide; the lifting platform anti-overturning device comprises a second anti-overturning wheel which is installed on the outer side of the second walking wheel and slides in cooperation with the second rail. The hanging bracket system does not occupy outdoor engineering sites, outdoor engineering can be inserted in advance for construction, and the overall construction period is shortened.
本发明公开了一种轨道式升降平台与轨道式吊架一体化系统,包括:固定于主体结构上的第一轨道和第二轨道,第一轨道位于主体结构最外侧,第二轨道位于主体结构的相对内侧;吊架的顶部设有悬挑支臂,悬挑支臂的端部安装有与第一轨道配合滑动的第一行走轮;吊架防脱轨装置,包括安装于第一行走轮两侧的第一防倾覆轮和防脱轨限位轴承,第一防倾覆轮和防脱轨限位轴承相对滑动于第一轨道的两侧;升降平台,升降平台的底部安装有与第二轨道配合滑动的第二行走轮;升降平台防倾覆装置,包括安装于第二行走轮外侧且与第二轨道配合滑动的第二防倾覆轮。吊架系统不占用室外工程场地,室外工程可提前插入施工,缩短整体工期。
Rail-mounted lifting platform and rail-mounted hanging bracket integrated system
轨道式升降平台与轨道式吊架一体化系统
CHEN YI (Autor:in) / LIU FEI (Autor:in) / GONG FENGSHAN (Autor:in) / WANG YANFENG (Autor:in) / WANG BO (Autor:in) / XIA JIANYONG (Autor:in) / WU TAO (Autor:in) / MA JUNFENG (Autor:in) / WEI PENG (Autor:in) / ZHANG JIAXIN (Autor:in)
04.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste