Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reservoir dispatching and hydroelectric generation integrated control method and storage medium
The invention discloses a reservoir scheduling and hydroelectric generation integrated control method and a storage medium, the method comprises the following steps: setting a first-stage radial gate opening and closing control water level and a second-stage radial gate opening and closing control water level respectively, and performing water level trend judgment action on the radial gate control by the first-stage control water level and the reservoir inlet/outlet flow difference; the second-stage radial gate control water level directly acts on radial gate control, automatic dispatching of the spillway radial gate is achieved, and the water level of an upstream reservoir is controlled to be within the specified range of the determined electric quantity. According to the method, on the premise that hydroelectric generation is automatically controlled, automatic dispatching of the radial gate is achieved, the water level of a reservoir in front of a dam is within a reasonable interval, and safe and stable operation of a water conservancy building is guaranteed. The timeliness of radial gate control can be improved, and the working pressure of operators in the operation period in the flood season is relieved.
本发明公开了一种水库调度与水力发电一体化的控制方法及存储介质,该方法分别设置第一级和第二级共两级弧形闸门启闭控制水位,第一级控制水位与入/出库流量差做水位趋势判断动作于弧形闸门控制,第二级弧形闸门控制水位直接动作于弧形闸门控制,实现溢洪道弧形闸门的自动调度,控制上游库水位在认定电量规定范围内。该方法在对水力发电进行自动控制的前提下,实现弧形闸门的自动调度,使坝前水库水位在合理的区间内,保证水利建筑的安全稳定运行。本发明可提高弧形闸门控制的时效性,缓解了汛期运行期间运行人员的工作压力。
Reservoir dispatching and hydroelectric generation integrated control method and storage medium
The invention discloses a reservoir scheduling and hydroelectric generation integrated control method and a storage medium, the method comprises the following steps: setting a first-stage radial gate opening and closing control water level and a second-stage radial gate opening and closing control water level respectively, and performing water level trend judgment action on the radial gate control by the first-stage control water level and the reservoir inlet/outlet flow difference; the second-stage radial gate control water level directly acts on radial gate control, automatic dispatching of the spillway radial gate is achieved, and the water level of an upstream reservoir is controlled to be within the specified range of the determined electric quantity. According to the method, on the premise that hydroelectric generation is automatically controlled, automatic dispatching of the radial gate is achieved, the water level of a reservoir in front of a dam is within a reasonable interval, and safe and stable operation of a water conservancy building is guaranteed. The timeliness of radial gate control can be improved, and the working pressure of operators in the operation period in the flood season is relieved.
本发明公开了一种水库调度与水力发电一体化的控制方法及存储介质,该方法分别设置第一级和第二级共两级弧形闸门启闭控制水位,第一级控制水位与入/出库流量差做水位趋势判断动作于弧形闸门控制,第二级弧形闸门控制水位直接动作于弧形闸门控制,实现溢洪道弧形闸门的自动调度,控制上游库水位在认定电量规定范围内。该方法在对水力发电进行自动控制的前提下,实现弧形闸门的自动调度,使坝前水库水位在合理的区间内,保证水利建筑的安全稳定运行。本发明可提高弧形闸门控制的时效性,缓解了汛期运行期间运行人员的工作压力。
Reservoir dispatching and hydroelectric generation integrated control method and storage medium
一种水库调度与水力发电一体化的控制方法及存储介质
DING DEQIANG (Autor:in) / LIU ZHEN (Autor:in) / DAI MENG (Autor:in) / PEI HONGZHOU (Autor:in) / YIN ZHIFENG (Autor:in) / ZHOU MINGZHI (Autor:in) / LIU ZHIYUAN (Autor:in) / REN QICHENG (Autor:in) / WANG HAO (Autor:in) / TIAN YONGYI (Autor:in)
08.11.2022
Patent
Elektronische Ressource
Chinesisch
Reservoir dispatching method and device, electronic equipment and storage medium
Europäisches Patentamt | 2024
|Reservoir dispatching method and device, electronic equipment and storage medium
Europäisches Patentamt | 2024
|Reciprocating circulation hydroelectric power generation system for reservoir
Europäisches Patentamt | 2022
|Optimal policy of hydroelectric reservoir integrated spill flow
Taylor & Francis Verlag | 2023
|