Construction method for reinforcing inner side of silo
The invention relates to the technical field of silo building construction, in particular to a construction method for reinforcing the inner side of a silo, which comprises the following steps: S1, hoisting a repair template assembly into the silo, and connecting and fixing; s2, the repairing formwork assembly is moved to the designated construction height, and a first repairing space is constructed; s3, a first reinforcing layer is poured; s4, the bottom formwork is dismantled; s5, moving the side template; s6, the repairing template assembly is lifted, and a second repairing space is constructed; s7, a second reinforcing layer is poured; s8, the steps S4-S7 are repeated till the reinforced concrete on the inner wall of the silo is completely constructed, and the repairing formwork assembly is dismantled; when reinforcing construction is conducted on the inner side of the silo, related equipment installed in the silo does not need to be dismantled, construction operation is easy and convenient, construction materials in an upper construction area can be dragged in the construction process, influence on lower equipment is small, construction efficiency is improved, and cost is reduced.
本发明涉及筒仓建筑施工技术领域,尤其涉及一种筒仓内侧加固的施工方法,包括:S1、将修复模板组件吊装放入筒仓内部并进行连接固定;S2、修复模板组件移动至指定施工高度,构建第一修复空间;S3、浇筑第一加固层;S4、拆除底模板;S5、移动侧模板;S6、抬升修复模板组件,并构建第二修复空间;S7、浇筑第二加固层;S8、重复步骤S4‑S7,直到所述筒仓内壁的加强混凝土全部施工完毕,拆除所述修复模板组件;对筒仓内侧进行加固施工时,无需拆除已安装在的筒仓内相关设备,施工操作简便,施工过程中可以能够拖住上部施工区域的施工材料,对下部设备影响小,提高了施工效率高,降低了成本。
Construction method for reinforcing inner side of silo
The invention relates to the technical field of silo building construction, in particular to a construction method for reinforcing the inner side of a silo, which comprises the following steps: S1, hoisting a repair template assembly into the silo, and connecting and fixing; s2, the repairing formwork assembly is moved to the designated construction height, and a first repairing space is constructed; s3, a first reinforcing layer is poured; s4, the bottom formwork is dismantled; s5, moving the side template; s6, the repairing template assembly is lifted, and a second repairing space is constructed; s7, a second reinforcing layer is poured; s8, the steps S4-S7 are repeated till the reinforced concrete on the inner wall of the silo is completely constructed, and the repairing formwork assembly is dismantled; when reinforcing construction is conducted on the inner side of the silo, related equipment installed in the silo does not need to be dismantled, construction operation is easy and convenient, construction materials in an upper construction area can be dragged in the construction process, influence on lower equipment is small, construction efficiency is improved, and cost is reduced.
本发明涉及筒仓建筑施工技术领域,尤其涉及一种筒仓内侧加固的施工方法,包括:S1、将修复模板组件吊装放入筒仓内部并进行连接固定;S2、修复模板组件移动至指定施工高度,构建第一修复空间;S3、浇筑第一加固层;S4、拆除底模板;S5、移动侧模板;S6、抬升修复模板组件,并构建第二修复空间;S7、浇筑第二加固层;S8、重复步骤S4‑S7,直到所述筒仓内壁的加强混凝土全部施工完毕,拆除所述修复模板组件;对筒仓内侧进行加固施工时,无需拆除已安装在的筒仓内相关设备,施工操作简便,施工过程中可以能够拖住上部施工区域的施工材料,对下部设备影响小,提高了施工效率高,降低了成本。
Construction method for reinforcing inner side of silo
筒仓内侧加固的施工方法
LEE IL-YONG (Autor:in) / HOU JINFANG (Autor:in) / DU CHUANG (Autor:in)
08.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete connected silo reinforcing structure and method