Construction method of prefabricated composite floor slab
The invention provides a construction method of a prefabricated composite floor slab. The construction method comprises the following steps that at least one first lifting point is formed on each of two steel beams, located on the upper layer, of a main steel structural component; the composite floor slab is laid on a steel beam, located on the lower layer, of the main body steel structural component, wherein the composite floor slab is provided with at least two second lifting points; the first lifting point and the second lifting point are connected through a connecting piece; and pouring concrete. According to the construction method of the prefabricated composite floor slab, suspension type supporting of the prefabricated composite floor slab is achieved through the connecting pieces, the rigidity of the prefabricated composite floor slab in the construction stage is guaranteed, meanwhile, multi-layer synchronous construction of the composite floor slab can be achieved through the construction method, and the purpose of shortening the construction period is achieved.
本发明提供了一种预制叠合楼板的施工方法,包括以下步骤:在主体钢结构构件的位于上层的两个钢梁上分别形成至少一个第一吊点;将所述叠合楼板铺设在所述主体钢结构构件的位于下层的钢梁上,其中所述叠合楼板具有至少两个第二吊点;利用连接件将所述第一吊点和所述第二吊点相连;浇筑混凝土。本发明的预制叠合楼板的施工方法通过连接件实现对预制叠合楼板的悬挂式支撑,保证其在施工阶段的刚度,同时,这种施工方法可以实现叠合楼板多层同步施工,达到节省工期的目的。
Construction method of prefabricated composite floor slab
The invention provides a construction method of a prefabricated composite floor slab. The construction method comprises the following steps that at least one first lifting point is formed on each of two steel beams, located on the upper layer, of a main steel structural component; the composite floor slab is laid on a steel beam, located on the lower layer, of the main body steel structural component, wherein the composite floor slab is provided with at least two second lifting points; the first lifting point and the second lifting point are connected through a connecting piece; and pouring concrete. According to the construction method of the prefabricated composite floor slab, suspension type supporting of the prefabricated composite floor slab is achieved through the connecting pieces, the rigidity of the prefabricated composite floor slab in the construction stage is guaranteed, meanwhile, multi-layer synchronous construction of the composite floor slab can be achieved through the construction method, and the purpose of shortening the construction period is achieved.
本发明提供了一种预制叠合楼板的施工方法,包括以下步骤:在主体钢结构构件的位于上层的两个钢梁上分别形成至少一个第一吊点;将所述叠合楼板铺设在所述主体钢结构构件的位于下层的钢梁上,其中所述叠合楼板具有至少两个第二吊点;利用连接件将所述第一吊点和所述第二吊点相连;浇筑混凝土。本发明的预制叠合楼板的施工方法通过连接件实现对预制叠合楼板的悬挂式支撑,保证其在施工阶段的刚度,同时,这种施工方法可以实现叠合楼板多层同步施工,达到节省工期的目的。
Construction method of prefabricated composite floor slab
预制叠合楼板的施工方法
WANG YANPENG (Autor:in) / WANG XIAOLONG (Autor:in) / YI GENHE (Autor:in) / MI YANYAN (Autor:in) / LIU XINZHONG (Autor:in)
11.11.2022
Patent
Elektronische Ressource
Chinesisch
Prefabricated composite floor slab, construction method and prefabricated bottom plate
Europäisches Patentamt | 2024
|Prefabricated composite floor slab fixing mounting construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|